21 |
Completion of Balance Work of Inland Waterway Terminal at Jogighopa at Risk & Cost of EPC Contractor (Installation of Fenders) in the state of Assam in the year 2025-26-2nd Call
|
Assam |
02-08-2025 |
|
|
View Details |
22 |
Completion of Balance Work of Inland Waterway Terminal at Jogighopa at Risk and Cost of EPC Contractor in the state of Assam in the year 2025-26-2nd Call
|
Assam |
02-08-2025 |
|
|
View Details |
23 |
“Hiring of Machinery for Clearance of Landslide and other associated works on project “Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210)
|
Sikkim |
31-07-2025 |
|
|
View Details |
24 |
Hiring of Machinery for Clearance of Landslide and other associated works on project “Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 58.840 to Km 75.000)
|
Sikkim |
31-07-2025 |
|
|
View Details |
25 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane with Paved Shoulder, High Speed Corridor from Guwahati (near Jorabat) to Barapani ( near Mawlyngkhung) in the State of Meghalaya
|
Meghalaya |
30-07-2025 |
|
|
View Details |
26 |
Providing the Services of Commercial Vehicle On Monthly Basis to NHIDCL, PMU-Gyalshing (Sikkim)
|
Sikkim |
29-07-2025 |
|
|
View Details |
27 |
RFP for Restoration/Rehabilitation of Churachandpur-Tipaimukh road NH-02 (Old NH-150) from Km 9.00 to Km 70.00 (Total Length = 61.00 Km) in the State of Manipur in FY 2025-26 on EPC mode.
|
Manipur |
28-07-2025 |
|
|
View Details |
28 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode (2nd call)
|
Sikkim |
28-07-2025 |
02-09-2025 |
2025_NHIDC_862528_1 |
View Details |
29 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call)
|
West Bengal |
28-07-2025 |
13-08-2025 |
|
View Details |
30 |
Notice Inviting Bid for Renting Office Premises of NHIDCL, PMU under RO-Shillong, in the State of Meghalaya.
|
Meghalaya |
28-07-2025 |
|
|
View Details |