| 21 |
Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 3rd Call
|
Sikkim |
27-04-2026 |
|
|
View Details |
| 22 |
Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan.
|
Tripura |
27-04-2026 |
27-04-2026 |
|
View Details |
| 23 |
Spot improvements and protection works on NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
24-04-2026 |
24-04-2026 |
|
View Details |
| 24 |
Slope stabilization and protection works at CH Km 25.8 near Likhuveer of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal”
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 25 |
Slope stabilization and protection works at CH Km 40.05 near 7th Mile of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 26 |
Slope stabilization and protection works at CH Km 49.50 near Bhotebhir of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 27 |
Restoration works under “Specialized Repairs” through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis.
|
Tripura |
16-04-2026 |
16-04-2026 |
|
View Details |
| 28 |
Performance based Maintenance Contracts (PBMC) work of 4- laning of Dimapur-Kohima Road from design Km 123.840 to Km 138.775, in the state of Nagaland under Package-I at “Risk & Cost” of EPC Contractor in FY: 2025 – 26
|
Nagaland |
16-04-2026 |
16-04-2026 |
|
View Details |
| 29 |
REQUEST FOR PROPOSAL for Engagement of Communication and Creative Agencies for NHIDCL (Limited Tender Enquiry)
|
Delhi |
15-04-2026 |
15-04-2026 |
|
View Details |
| 30 |
Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 2nd Call
|
Sikkim |
14-04-2026 |
|
|
View Details |