| 41 |
Spot improvements and protection works on NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
24-04-2026 |
24-04-2026 |
|
View Details |
| 42 |
Slope stabilization and protection works at CH Km 25.8 near Likhuveer of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal”
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 43 |
Slope stabilization and protection works at CH Km 40.05 near 7th Mile of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 44 |
Slope stabilization and protection works at CH Km 49.50 near Bhotebhir of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 45 |
Restoration works under “Specialized Repairs” through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis.
|
Tripura |
16-04-2026 |
16-04-2026 |
|
View Details |
| 46 |
Performance based Maintenance Contracts (PBMC) work of 4- laning of Dimapur-Kohima Road from design Km 123.840 to Km 138.775, in the state of Nagaland under Package-I at “Risk & Cost” of EPC Contractor in FY: 2025 – 26
|
Nagaland |
16-04-2026 |
16-04-2026 |
|
View Details |
| 47 |
REQUEST FOR PROPOSAL for Engagement of Communication and Creative Agencies for NHIDCL (Limited Tender Enquiry)
|
Delhi |
15-04-2026 |
15-04-2026 |
|
View Details |
| 48 |
Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 2nd Call
|
Sikkim |
14-04-2026 |
|
|
View Details |
| 49 |
Widening/Up-Gradation of Intermittent Two Lane plus Paved Shoulder Stretches to Four Lane between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km 263+070) [Donipawa] of 9.866 Km Length on Khellani–Khanabal Section of NH-244 in the UT of Jammu & Kashmir
|
Union Territory of Jammu and Kashmir |
08-04-2026 |
08-04-2026 |
|
View Details |
| 50 |
Short Term Maintenance Contract (STMC) on NH-10 for the section from km 64 Singtam Bridge to km 80 Indian Oil Fuel Station Ranipool under the jurisdiction of PMU-Ranipool, NHIDCL on Percentage Rate Contract Basis for FY 2026-27 in the state of Sikkim
|
Sikkim |
07-04-2026 |
07-04-2026 |
|
View Details |