41 |
Emergency maintenance in stretches of the project “Restoration and Rehabilitation of Imphal-Kohima Road from km 212.325 to km 263.000[Length=50.675] in the state of Manipur in the year 2022-23 on EPC mode” at the risk & cost of the contractor, on Item rate basis and work order basis
|
Manipur |
05-06-2025 |
|
View Details |
42 |
Engagement of Media Tracking & Analytics Agencies for MoRTH
|
Delhi |
05-06-2025 |
|
View Details |
43 |
Short Term Maintenance for Landslide Debris Clearance from Km 368.00 to 468.00 of National Highway No.07 (Old NH-58) in the State of Uttarakhand
|
Uttarakhand |
05-06-2025 |
|
View Details |
44 |
Balance work of Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 27+150 (Golai Goan) to km 47+682 (Ledo) on Dibrugarh to Ledo section with proposed Margherita & Ledo Bypass (Brownfield and Green Field) (2-Lane+PS) of NH-38 in Tinsukia District in the State of Assam on EPC mode.(Package-5) For Details
|
Assam |
02-06-2025 |
|
View Details |
45 |
Short Term Maintenance Contract (STMC) from km 0.000 to km 20.300 and 22.000 to 23.000 (Total length 21.300 km) on road Udaipur to Melaghar (Spur NH-08) in the State of Tripura in the FY 2025-26 on percentage basis and work order basis. For Details
|
Tripura |
14-05-2025 |
|
View Details |
46 |
Strengthening of Churachandpur to Imphal section of old NH-150 (new NH-02) from Churachandpur Police Station (km 402+000) to Malom Oil Depot Gate (km 454+798) in the State of Manipur on EPC mode under NH(O)-NE (Length-53.400 km)
|
Manipur |
07-05-2025 |
06fac |
View Details |
47 |
Request for Proposal (RFP) for Engagement of Communication and Media Tracking & Analytics Agency for MoRTH
|
Delhi |
30-04-2025 |
6b440 |
View Details |
48 |
Consultancy Services as Independent Engineer during Operation and Maintenance of Sonamarg Tunnel tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of J&K on DBFOT annuity basis
|
Union Territory of Jammu and Kashmir |
30-04-2025 |
6ce59 |
View Details |
49 |
Short Term maintenance for Restoration of Breach of formation on valley side & Slope Protectionnworks at Tangni-I (from Km. 454+650 to km. 454+800) and Tangni-II (from Km. 455+260 to Km.455+300) on NH-07 in the state of Uttarakhand under M&R. For Detail
|
Uttarakhand |
29-04-2025 |
|
View Details |
50 |
Invitation of tender for Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode. (iii) 4-Laning from Rangagara to Kaliabhor Tiniali from km 297.00 to km 315.315 of NH-37 on EPC basis. (iv) 4-Laning from Kaliabor Tinali to Dolabari section from Km 0.0 to Km 17.3 of NH 37-A including construction of new Brahmaputra bridge. (v) 4-Lane highway connecting km 17.3 of NH 37A and km 182 of NH 52 between Dolabari and Jamuguri on EPC basis. (vi) Construction of Jia Bharali Bridge (1.2Km) along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715). (vii) Construction of Service road and RCC drain of from Kaliabor-Tinali (0.000) to Kolong Bridge (0+600) on EPC mode on NH-37 A
|
Assam |
28-04-2025 |
02fcd |
View Details |