| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
|---|---|---|---|---|---|---|
| 91 | Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 3rd Call | Sikkim | 27-04-2026 | View Details | ||
| 92 | Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan. | Tripura | 27-04-2026 | 27-04-2026 | View Details | |
| 93 | Spot improvements and protection works on NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal | West Bengal | 24-04-2026 | 24-04-2026 | View Details | |
| 94 | Slope stabilization and protection works at CH Km 25.8 near Likhuveer of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal” | West Bengal | 22-04-2026 | 22-04-2026 | View Details | |
| 95 | Slope stabilization and protection works at CH Km 40.05 near 7th Mile of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal | West Bengal | 22-04-2026 | 22-04-2026 | View Details | |
| 96 | Slope stabilization and protection works at CH Km 49.50 near Bhotebhir of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal | West Bengal | 22-04-2026 | 22-04-2026 | View Details | |
| 97 | Restoration works under “Specialized Repairs” through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis. | Tripura | 16-04-2026 | 16-04-2026 | View Details | |
| 98 | Performance based Maintenance Contracts (PBMC) work of 4- laning of Dimapur-Kohima Road from design Km 123.840 to Km 138.775, in the state of Nagaland under Package-I at “Risk & Cost” of EPC Contractor in FY: 2025 – 26 | Nagaland | 16-04-2026 | 16-04-2026 | View Details | |
| 99 | REQUEST FOR PROPOSAL for Engagement of Communication and Creative Agencies for NHIDCL (Limited Tender Enquiry) | Delhi | 15-04-2026 | 15-04-2026 | View Details | |
| 100 | Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 2nd Call | Sikkim | 14-04-2026 | View Details |