111 |
Restoration and Rehabilitation of NH-02 of Imphal-Kohima Road from design Ch. km 287.000 (Sapermaina) to km 297.700 (Sekmai) [Total Length = 10.700 km] in the state of Manipur in the year 2024-25
|
Manipur |
05-02-2025 |
6c448 |
View Details |
112 |
Providing the Services of Vehicle on Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim)
|
Sikkim |
03-02-2025 |
8aa85 |
View Details |
113 |
Invitation of Tender For Providing the Services of Vehicle On Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim)
|
Sikkim |
03-02-2025 |
ccdaf |
View Details |
114 |
Expression of Interest for Empanelment of Tunnel Expert For Details
|
Delhi |
01-02-2025 |
f3c0a |
View Details |
115 |
Expression of Interest for Empanelment of Tunnel Expert
|
Delhi |
01-02-2025 |
|
View Details |
116 |
One Time Improvement of Ukhrul-Toloi-Tadubi road (i.e., Existing Ukhrul Town/Bypass, Road) section from Km 0.00 to Km 09.00 covering 9.00 Km length on NH-102A in the state of Manipur in the FY-2024-2025 on EPC mode
|
Manipur |
30-01-2025 |
35f24 |
View Details |
117 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge along with its approaches connecting NH-10 with NH-510 near Singtam, development of its junction and identification & realignment from Km 0+000 to Km 3+074 (Singtam-Tarku) on NH-510 into 2 lane with paved shoulder configuration along with permanent mitigation measures for landslide/sinking/slip zones on existing section in the State of Sikkim
|
Sikkim |
30-01-2025 |
89511 |
View Details |
118 |
Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode under NH (O) (Package-1A)
|
Nagaland |
27-01-2025 |
91178 |
View Details |
119 |
Urgent Road Repair Works along the Habitations from Km 242.00 to Km 298.00 on NH-4 in the UT of Andaman & Nicobar Islands at the Risk & Cost of existing EPC Contractor for Package-II, on Item Rate & Work Order Basis, through Limited Tender, in FY 2024-25
|
Union Territory of Jammu and Kashmir |
23-01-2025 |
a2a80 |
View Details |
120 |
Widening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement & Co
|
Manipur |
23-01-2025 |
d283c |
View Details |