| 111 |
Restoration and repair of road by way of clearance of landslide, surface boulders, side drain, culverts including construction of R/walls and B/walls and laying of Dense Bituminous Macadam & Bituminous Concrete on NH-244 from Sinthantop to Vailoo (Km 193.000 to Km 235.000) in the UT of J&K.(2nd Call)
|
Union Territory of Jammu and Kashmir |
29-10-2025 |
|
|
View Details |
| 112 |
Performance based Maintenance Contracts (PBMC) work of AsianHighway 02 (Ch. 0+000 to 1+500) from Nepal Border Mechi Bridge and approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India in the state of West Bengal in FY: 2025 - 26
|
West Bengal |
27-10-2025 |
14-11-2025 |
2025_NHIDC_879947_1 |
View Details |
| 113 |
Restoration & Repairs by way of clearance of landslide, surface boulders, side drain, construction of pipe culverts, R/walls, B/walls ,RCC drain and laying of bituminous carpeting incl. Installing of Road safety Item Metallic Crash Barrier, Retroreflective Sign Board, Road marking, Delineators & Road studs from existing Km. 97.000 to Km. 123.500 on Dulhasti - Kishtwar- Bandarkoot-Kurya existing section of NH-244 in the UT of Jammu & Kashmir for FY 2025 -2026 through Performance Based Maintenance Contract (PBMC)
|
Union Territory of Jammu and Kashmir |
22-10-2025 |
|
|
View Details |
| 114 |
Expression of Interest (EOI) for Empanelment of Bridge Experts in NHIDCL
|
Delhi |
15-10-2025 |
|
|
View Details |
| 115 |
Supply of manpower (skilled) & equipments for FWD survey in total 38.80Km NH sections (from Bamuncherra to Srirampur on NH-208 and in Pkg-1't & Pkg-3'd of Agartala-Khowai section on NH-1088) to facilitate the CRRI-CSIR for undertaking of pavement evaluation study for various projects of NHIDCL on NH-208 & NH-1088 in the state of Tripura in the FY 2025-26
|
Tripura |
14-10-2025 |
|
|
View Details |
| 116 |
Suppty of manpower (skilted) & equipments for FWD survey in total 26.VOKn NH sections (from Kumarghat to Futtali) to facilitate the CRRI-CSIR for undertaking of pavement evaluation study for various projects of NHIDCL on NH-208 in the state of Tripura in the FY 2A25-26
|
Tripura |
14-10-2025 |
|
|
View Details |
| 117 |
Suppty of manpower {skilted} & equipments for BT core cutting and excavation of testing pits in total 100km NH projects to facilitate the CRRI-CSIR for undertaking of pavement evaluation study for various projects of NHIDCL on NH-208 & NH-1088 in the state of Tripura in the FY 2025-26
|
Tripura |
14-10-2025 |
|
|
View Details |
| 118 |
Supply of manpower (skilted) & equipments for FWD survey in total 34.50Km Nl'l sections (from Fultali to Bamuncherra) to facilitate the CRRI-CSIR for undertaking of pavement evaluation study for various projects of NHIDCL on NH-208 in the state of Tripura in the FY 2025-26
|
Tripura |
14-10-2025 |
|
|
View Details |
| 119 |
CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) "WIDENING AND UP-GRADATION OF EXISTING CARRIAGEWAY INTO 2-LANE WITH PAVED SHOULDER FROM LAVAMORE TO START OF PEDONG BYPASS ALONG NH-717A FROM KM 61.100 TO KM 79.700 IN THE STATE OF WEST BENGAL ON EPC MODE & (II) WIDENING AND UP-GRADATION OF EXISTING CARRIAGEWAY INTO 2-LANE WITH PS CONFIGURATION FROM RESHI TO RHENOCK FROM CH. 96.254 TO CH. 101.554 ALONG NH- 717A IN THE STATE OF SIKKIM ON EPC MODE
|
Sikkim |
13-10-2025 |
21-10-2025 |
|
View Details |
| 120 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION AND UPGRADATION OF EXISTING ROAD ON NH-510 BETTWEEN RABANGLA TO GYALSHING TO 2-LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF SIKKIM UNDER SARDP-NE PHASE ‘A’ ON EPC MODE: (1) KM 32.500 TO KM 33.600 (PACKAGE-III) (2) KM 33.600 TO KM 58.840 (PACKAGE-IV) (3) KM 58.840 TO KM 75.00 (PACKAGE-V) (4) KM 75.000 TO KM 90.210 (PACKAGE-VI)
|
Sikkim |
13-10-2025 |
21-10-2025 |
|
View Details |