| 141 |
Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 66.610 to km 101.280 (Existing Chainage from km 67.496 to km 103.557) (PKG-IV) in the state of Manipur on EPC mode. (ii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 101.280 to km 131.280 (Existing Chainage from km 103.557 to km 134.821) (PKG-V) in the state of Manipur on EPC mode. (iii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 131.280 to km 169.570 (Existing Chainage from km 134.821 to km 175.105) (PKG-VI) in the state of Manipur on EPC mode. (iv) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 169.570 to km 205.974 (Existing Chainage from km 175.105 to km 214.289) (PKG-VII) in the state of Manipur on EPC mode
|
Manipur |
06-08-2025 |
13-08-2025 |
|
View Details |
| 142 |
Specialized Slope Protection Work of Section from Km. 25.600 to Km. 26.100 (Bagrakot - Kafer) of NH - 717 A in the State of West Bengal on EPC mode (Pkg-IVC) [2nd Call]
|
West Bengal |
04-08-2025 |
26-08-2025 |
|
View Details |
| 143 |
Completion of Balance Work of Inland Waterway Terminal at Jogighopa at Risk & Cost of EPC Contractor (Installation of Fenders) in the state of Assam in the year 2025-26-2nd Call
|
Assam |
02-08-2025 |
|
|
View Details |
| 144 |
Completion of Balance Work of Inland Waterway Terminal at Jogighopa at Risk and Cost of EPC Contractor in the state of Assam in the year 2025-26-2nd Call
|
Assam |
02-08-2025 |
|
|
View Details |
| 145 |
“Hiring of Machinery for Clearance of Landslide and other associated works on project “Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210)
|
Sikkim |
31-07-2025 |
|
|
View Details |
| 146 |
Hiring of Machinery for Clearance of Landslide and other associated works on project “Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 58.840 to Km 75.000)
|
Sikkim |
31-07-2025 |
|
|
View Details |
| 147 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane with Paved Shoulder, High Speed Corridor from Guwahati (near Jorabat) to Barapani ( near Mawlyngkhung) in the State of Meghalaya
|
Meghalaya |
30-07-2025 |
|
|
View Details |
| 148 |
Providing the Services of Commercial Vehicle On Monthly Basis to NHIDCL, PMU-Gyalshing (Sikkim)
|
Sikkim |
29-07-2025 |
|
|
View Details |
| 149 |
RFP for Restoration/Rehabilitation of Churachandpur-Tipaimukh road NH-02 (Old NH-150) from Km 9.00 to Km 70.00 (Total Length = 61.00 Km) in the State of Manipur in FY 2025-26 on EPC mode.
|
Manipur |
28-07-2025 |
|
|
View Details |
| 150 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode (2nd call)
|
Sikkim |
28-07-2025 |
02-09-2025 |
2025_NHIDC_862528_1 |
View Details |