Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 19.900 TO KM 40.090 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER

  • Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 19.900 TO KM 40.090 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER

Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 40.090 TO KM 65.300 [DESIGN KM. 40.000 TO KM. 62.558] (DESIGN LENGTH – 22.558 KM) IN THE STATE OF NAGALAND UNDE

  • Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 40.090 TO KM 65.300 [DESIGN KM. 40.000 TO KM. 62.558] (DESIGN LENGTH – 22.558 KM) IN THE STATE OF NAGALAND UNDE

Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to d

  • Read more about Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to d

Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur

  • Read more about Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur

Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur

  • Read more about Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur

Technical Evaluation Result for the Project of Construction and upgradation of existing road to two lane with paved shoulder from Km 0.00 to Km 16.539 of Ranipool – Pakyong of NH-717-A on EPC basis under SARDP-NE in the State of Sikkim. Dated : 09-03-2018

  • Read more about Technical Evaluation Result for the Project of Construction and upgradation of existing road to two lane with paved shoulder from Km 0.00 to Km 16.539 of Ranipool – Pakyong of NH-717-A on EPC basis under SARDP-NE in the State of Sikkim. Dated : 09-03-2018

Technical Result for the Project of Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length in the state of Jammu and Kashmir to be executed on EPC basis. D

  • Read more about Technical Result for the Project of Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length in the state of Jammu and Kashmir to be executed on EPC basis. D

Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zo

  • Read more about Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zo

Technical Result for the Project of Rehabilitation and up-gradation of section from Km 107.760 to Km 129.445 (After Middle strait to Humphrey), Km 130.600 to Km 138 (After Humphrey to Kadamtala) & Km 155.00 to Km 181.0 (End of Jarwa to Rangat) of NH-4 (To

  • Read more about Technical Result for the Project of Rehabilitation and up-gradation of section from Km 107.760 to Km 129.445 (After Middle strait to Humphrey), Km 130.600 to Km 138 (After Humphrey to Kadamtala) & Km 155.00 to Km 181.0 (End of Jarwa to Rangat) of NH-4 (To

Technical Evaluation Result for the Project of 2 LANING OF EXISTING HUNLI-ANINI FROM DESIGN KM 120.000 TO KM 130.300 (TOTAL LENGTH =10.300 KMS) IN THE STATE OF ARUNACHAL PRADESH ON EPC BASIS UNDER SARDP-NE ON EPC MODE. Dated : 06-03-2018

  • Read more about Technical Evaluation Result for the Project of 2 LANING OF EXISTING HUNLI-ANINI FROM DESIGN KM 120.000 TO KM 130.300 (TOTAL LENGTH =10.300 KMS) IN THE STATE OF ARUNACHAL PRADESH ON EPC BASIS UNDER SARDP-NE ON EPC MODE. Dated : 06-03-2018

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 93
  • Page 94
  • Page 95
  • Page 96
  • Current page 97
  • Page 98
  • Page 99
  • Page 100
  • Page 101
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 194946