Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 430.000 to Km. 468.000 of Chamoli to Paini (Excluding Km 437.625 to Km 437.775, Km 458.900 to Km 459.475 and Km 464.425 to Km 464.525)

  • Read more about Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 430.000 to Km. 468.000 of Chamoli to Paini (Excluding Km 437.625 to Km 437.775, Km 458.900 to Km 459.475 and Km 464.425 to Km 464.525)

Technical Evaluation Result for the Project of Rehabilitation and Up-gradation of section from Km 206.000 to Km 239.445 (Nimbutala to Austin Creek) of NH-4 (Old NH-223) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands. Date

  • Read more about Technical Evaluation Result for the Project of Rehabilitation and Up-gradation of section from Km 206.000 to Km 239.445 (Nimbutala to Austin Creek) of NH-4 (Old NH-223) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands. Date

Revised Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along w

  • Read more about Revised Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along w

Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 20.456 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAN

  • Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 20.456 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAN

Revised Technical Evaluation Result for the Project of Construction and upgradation of existing road to two lane with paved shoulder from Km 0.00 to Km 16.539 of Ranipool – Pakyong of NH-717-A on EPC basis under SARDP-NE in the State of Sikkim. Dated : 15

  • Read more about Revised Technical Evaluation Result for the Project of Construction and upgradation of existing road to two lane with paved shoulder from Km 0.00 to Km 16.539 of Ranipool – Pakyong of NH-717-A on EPC basis under SARDP-NE in the State of Sikkim. Dated : 15

Technical Evaluation Result for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis” (Re-tender) Dated : 14-03-2018

  • Read more about Technical Evaluation Result for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis” (Re-tender) Dated : 14-03-2018

Revised Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.

  • Read more about Revised Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.

Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis”. (Retender) Dated : 14-03-2018

  • Read more about Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis”. (Retender) Dated : 14-03-2018

Technical Evaluation Result for the Project of “Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis” (Retender) Dated : 14-03-2018

  • Read more about Technical Evaluation Result for the Project of “Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis” (Retender) Dated : 14-03-2018

Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 19.900 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER

  • Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 19.900 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 92
  • Page 93
  • Page 94
  • Page 95
  • Current page 96
  • Page 97
  • Page 98
  • Page 99
  • Page 100
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 194944