Sub Title
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 100.345 TO KM 122.250 [DESIGN KM. 95.000 TO KM. 115.534] (DESIGN LENGTH – 25.534 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
Upload file
Year