Sub Title
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 60.345 TO KM 98.065 [DESIGN KM. 59.000 TO KM. 86.835] (DESIGN LENGTH – 27.835 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
Upload file
Year