Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM TAKSING TO GHORA FROM KM 0.000 TO KM 7.090 IN UPPER SUBANSIRI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 09-03-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM TAKSING TO GHORA FROM KM 0.000 TO KM 7.090 IN UPPER SUBANSIRI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 09-03-2021.
Technical Evaluation Result for Reconstruction of 94 Nos. of culverts in the stretch from Km 298.00 to km 330.662 (Karala to Kalipur) of NH-04 in the Union Territory of Andaman & Nicobar Islands on EPC Mode. Dated: 05-03-2021. Read more about Technical Evaluation Result for Reconstruction of 94 Nos. of culverts in the stretch from Km 298.00 to km 330.662 (Karala to Kalipur) of NH-04 in the Union Territory of Andaman & Nicobar Islands on EPC Mode. Dated: 05-03-2021.
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th Read more about Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th Read more about Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-6th Call. Dated: 19-02-2021. Read more about Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-6th Call. Dated: 19-02-2021.
Technical Evaluation Result for Purchase of 15 KVA DG set with installation for Project Monitoring Unit- Rhenock in State of Sikkim on e-tendering mode. Dated: 16-02-2021. Read more about Technical Evaluation Result for Purchase of 15 KVA DG set with installation for Project Monitoring Unit- Rhenock in State of Sikkim on e-tendering mode. Dated: 16-02-2021.
Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Ladakh. Dated: 17-02-2021. Read more about Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Ladakh. Dated: 17-02-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana. Dated: 15-02-2021. Read more about Technical Evaluation Result for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana. Dated: 15-02-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB , length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode. Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB , length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode.
Technical Evaluation Result for Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC Mode. (Pkg-III). Dated: 0 Read more about Technical Evaluation Result for Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC Mode. (Pkg-III). Dated: 0