Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Da

  • Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Da

Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands-2 Call. Dated: 03-02-2021.

  • Read more about Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands-2 Call. Dated: 03-02-2021.

Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode. Dated: 03-02-20

  • Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode. Dated: 03-02-20

Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode. Dated: 02-02-2

  • Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode. Dated: 02-02-2

Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) – TSP. Dated: 02-02-202

  • Read more about Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) – TSP. Dated: 02-02-202

Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated: 02-02-

  • Read more about Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated: 02-02-

Technical Evaluation Result for Realignment of NH717A from Design CH: 0.00 (Km 77.800 of NH-10) to Design CH: 2.00 (Km 3.100 of NH-717A) with two lane paved shoulder including Major Bridge of 680 m in the State of Sikkim on EPC Mode. Dated: 02-02-2021.

  • Read more about Technical Evaluation Result for Realignment of NH717A from Design CH: 0.00 (Km 77.800 of NH-10) to Design CH: 2.00 (Km 3.100 of NH-717A) with two lane paved shoulder including Major Bridge of 680 m in the State of Sikkim on EPC Mode. Dated: 02-02-2021.

Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-II)

  • Read more about Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-II)

Technical Evaluation Result for Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani-Khanabal section of N

  • Read more about Technical Evaluation Result for Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani-Khanabal section of N

Technical Evaluation Result for Ordinary Repair of Ukhrul-Toloi-Tadubi road from km 00.000 to km 60.000 covering 60.00 Km length on NH-102A in the state of Manipur on Item Rate Basis. Dated: 01-02-2021.

  • Read more about Technical Evaluation Result for Ordinary Repair of Ukhrul-Toloi-Tadubi road from km 00.000 to km 60.000 covering 60.00 Km length on NH-102A in the state of Manipur on Item Rate Basis. Dated: 01-02-2021.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 54
  • Page 55
  • Page 56
  • Page 57
  • Current page 58
  • Page 59
  • Page 60
  • Page 61
  • Page 62
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 195588