Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 84.800 to km  111.580 (Package-III) in the State of Mizoram under Bharatmala&n

  • Read more about Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 84.800 to km  111.580 (Package-III) in the State of Mizoram under Bharatmala&n

Revised Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte  – Champhai road (International Corridor) of NH-6 from Design Chainage  Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram u

  • Read more about Revised Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte  – Champhai road (International Corridor) of NH-6 from Design Chainage  Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram u

Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 54.400 to km  72.350 (Package-I) in the State of Mizoram under Bharatmala Pari

  • Read more about Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 54.400 to km  72.350 (Package-I) in the State of Mizoram under Bharatmala Pari

Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on

  • Read more about Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on

Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on

  • Read more about Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on

Technical Evaluation Result for Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.08 (Chattroo) of 15.54 Km length on Khellani – Kishtwar – Chattroo section on NH-244 in the Union Territory of Jammu & Kash

  • Read more about Technical Evaluation Result for Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.08 (Chattroo) of 15.54 Km length on Khellani – Kishtwar – Chattroo section on NH-244 in the Union Territory of Jammu & Kash

Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojan

  • Read more about Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojan

Technical Evaluation Result for construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bhara

  • Read more about Technical Evaluation Result for construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bhara

Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. Dated: 25-03-2021

  • Read more about Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. Dated: 25-03-2021

Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct

  • Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 49
  • Page 50
  • Page 51
  • Page 52
  • Current page 53
  • Page 54
  • Page 55
  • Page 56
  • Page 57
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 196147