Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu &

  • Read more about Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu &

Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Bongaigaon (Assam)- 2nd Call. Dated: 30-03-2021.

  • Read more about Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Bongaigaon (Assam)- 2nd Call. Dated: 30-03-2021.

Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 88+980 Km (PKG-3A) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. D

  • Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 88+980 Km (PKG-3A) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. D

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Pac

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Pac

Technical Evaluation Result for Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani – Kishtwar –Chattroo section and a link road to Kishtwar town of 1.

  • Read more about Technical Evaluation Result for Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani – Kishtwar –Chattroo section and a link road to Kishtwar town of 1.

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 11

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 11

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 28-03-202

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 28-03-202

Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 10.000 near Dialong Village to km 21.900 near Old Tamenglong Village (Length- 11.90 km) (Package-2A) on EPC mode.

  • Read more about Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 10.000 near Dialong Village to km 21.900 near Old Tamenglong Village (Length- 11.90 km) (Package-2A) on EPC mode.

Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 10.000 near Dialong Village to km 21.900 near Old Tamenglong Village (Length- 11.90 km) (Package-2A) on EPC mode.

  • Read more about Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 10.000 near Dialong Village to km 21.900 near Old Tamenglong Village (Length- 11.90 km) (Package-2A) on EPC mode.

Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 83.800 Km (Total length= 17.69 Km) (PKG-5) in the State of Manipur on Engineering, Procurement & Constr

  • Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 83.800 Km (Total length= 17.69 Km) (PKG-5) in the State of Manipur on Engineering, Procurement & Constr

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 47
  • Page 48
  • Page 49
  • Page 50
  • Current page 51
  • Page 52
  • Page 53
  • Page 54
  • Page 55
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 28/09/2025