Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Tender ID | View Details |
|---|---|---|---|---|---|
| 11 | Maintenance & Repair work at kanchanpur market area from Km 43+050 to Km 43+560 & Km 43+670 to km 43+935 of Lalchera – Kanchanpur via Shivbari road section on NH-44A (New NH-108) at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis. | Tripura | 30-03-2026 17:30:00 | View Details | |
| 12 | BALANCE WORK OF STRENGTHENING OF UKHRUL TO CHOITHAR SECTION OF NH-202 FROM EXISTING KM 50+520 TO KM 59+236 (DESIGN CHAINAGE KM 45+600 TO KM 54+212) IN THE STATE OF MANIPUR ON EPC MODE UNDER NH(O)-NE (PACKAGE-4, LENGTH-8.612 KM) | Manipur | 30-03-2026 15:30:00 | View Details | |
| 13 | Maintenance & Repair work on Agartala to Khowai NH-108B from Km 19.300 to Km 32.800 at various sections i.e, Mohanpur to Subalsingh section at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis. | Tripura | 28-03-2026 17:30:00 | View Details | |
| 14 | Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim | Sikkim | 28-03-2026 16:30:00 | View Details | |
| 15 | Tender for selection of Manpower Placement Agency for providing services of Junior Manager (HR), Young legal Professional, SAP Consultant, Accountant, LA Consultant, Liaison Officer, Steno, PA, OfficeAssistant, DataEntryOperator, Multi-TaskingStaff,etc.(skilled.)manpower services to the National Highways and Infrastructure Development Corporation Limited, Regional Office – Aizawl | Mizoram | 28-03-2026 12:30:00 | View Details | |
| 16 | Hiring of Machinery for Clearance of Landslides and Miscellaneous works from km 0 to km 26 on NH-10 (SevokeRangpo section) in the State of West Bengal on percentage Rate Basis during the FY 2025-2026. | West Bengal | 27-03-2026 17:30:00 | View Details | |
| 17 | Hiring of Machinery for Clearance of Landslides and Miscellaneous works from km 26.00 to km 52.10 on NH-10 (Sevoke-Rangpo section) in the State of West Bengal on percentage Rate Basis during the FY 2025-2026 | West Bengal | 27-03-2026 17:30:00 | View Details | |
| 18 | Construction of 2-Lane with paved shoulder of Existing Intermediate Lane of NH-137G from Village near Pailapool at Design Ch. 0+00 (Ch. 20.800 of Silchar Jiribam Pkg-I, NH-37) to Village P.Songkai at Design Ch. 58+342 (Ch. 106+830 of Tamenglong- Mahur section of NH-137) near Hangrum (Length: 58.342 km) in the State of Assam under NH(O)-NE on Hybrid Annuity Mode | Assam | 26-03-2026 11:30:00 | View Details | |
| 19 | Special repair through Short Term Maintenance Contract on Mungiakami - Champaknagar road section in various stretches (from km 422.000 to km 423.000, km 436.700 to km 437.500, km 437.750 to km 438.000, km 438.340 to km 443.000, km 444.000 to km 445.000, km 453.000 to km 455.000 (Total Length = 9.710 km) & road safety work from km 422.000 to 456+500 ( Length= 34.500 km) in the state of Tripura in the FY 2025-26 on percentage and work order basis. | Tripura | 24-03-2026 17:30:00 | View Details | |
| 20 | Widening/Up-Gradation of Intermittent Two Lane plus Paved Shoulder Stretches to Four Lane between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km 263+070) [Donipawa] of 9.866 Km Length on Khellani–Khanabal Section of NH-244 in the UT of Jammu & Kashmir | Union Territory of Jammu and Kashmir | 23-03-2026 15:30:00 | View Details |