Final Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode”. Dated : 09-02-2018 Read more about Final Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode”. Dated : 09-02-2018
Modified Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing ( Read more about Modified Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (
Revised Technical Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode. Dated : Read more about Revised Technical Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode. Dated :
Technical Evaluation Result Cancellation Notice for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis. Dated : 30-01-2018 Read more about Technical Evaluation Result Cancellation Notice for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis. Dated : 30-01-2018
Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (PC) on Ba Read more about Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (PC) on Ba
Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Laning of Imp Read more about Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Laning of Imp
Technical Evaluation Result for the Project of Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of (i) Mar Read more about Technical Evaluation Result for the Project of Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of (i) Mar
Technical Evaluation Result & Cancellation Notice for the project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 16-01-2018 Read more about Technical Evaluation Result & Cancellation Notice for the project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 16-01-2018
New Technical evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A Read more about New Technical evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A
Technical evaluation result for the project of Restoration of road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall and B/walls and laying of WBM-I, WBM-II, WBM-III & Bituminous Carpeting on Sinthanp Read more about Technical evaluation result for the project of Restoration of road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall and B/walls and laying of WBM-I, WBM-II, WBM-III & Bituminous Carpeting on Sinthanp