Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for the Project of WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD FROM KM 85.000 TO 95.000 & 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE STATE OF MEGHALAYA WITH JAPA

  • Read more about Technical Evaluation Result for the Project of WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD FROM KM 85.000 TO 95.000 & 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE STATE OF MEGHALAYA WITH JAPA

Technical Result for the Project of Special Repair Works At Narrow zone and Landslide Area Between Rangpo and Ranipool on NH-10 in the State of Sikkim on EPC Basis. Dated : 20-03-2018

  • Read more about Technical Result for the Project of Special Repair Works At Narrow zone and Landslide Area Between Rangpo and Ranipool on NH-10 in the State of Sikkim on EPC Basis. Dated : 20-03-2018

Final Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the propo

  • Read more about Final Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the propo

Technical Result for the Project of Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 in the State of Jammu & Kashmir On EPC Mode. Dated : 2

  • Read more about Technical Result for the Project of Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 in the State of Jammu & Kashmir On EPC Mode. Dated : 2

Revised Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 20-03-2018

  • Read more about Revised Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 20-03-2018

Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 52.370 TO KM 79.040 [DESIGN KM. 50.000 TO KM. 75.000] (DESIGN LENGTH – 25.000 KM) IN THE STATE OF NAGALA

  • Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 52.370 TO KM 79.040 [DESIGN KM. 50.000 TO KM. 75.000] (DESIGN LENGTH – 25.000 KM) IN THE STATE OF NAGALA

Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 25.760 [DESIGN KM. 00.000 TO KM. 25.000] (DESIGN LENGTH – 25.00 KM) IN THE STATE OF NAGALAND

  • Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 25.760 [DESIGN KM. 00.000 TO KM. 25.000] (DESIGN LENGTH – 25.00 KM) IN THE STATE OF NAGALAND

Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur

  • Read more about Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur

Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chard

  • Read more about Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chard

Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 20.456 TO KM 41.065 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAN

  • Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 20.456 TO KM 41.065 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAN

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 90
  • Page 91
  • Page 92
  • Page 93
  • Current page 94
  • Page 95
  • Page 96
  • Page 97
  • Page 98
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 10/09/2025

  • Total Visitors: 138011