Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
Bid Due Date
Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
---|---|---|---|---|---|---|
1 | Expression of Interest (EOI) for Empanelment of Bridge Experts in NHIDCL | Delhi | 15-10-2025 18:00:00 | View Details | ||
2 | CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) "WIDENING AND UP-GRADATION OF EXISTING CARRIAGEWAY INTO 2-LANE WITH PAVED SHOULDER FROM LAVAMORE TO START OF PEDONG BYPASS ALONG NH-717A FROM KM 61.100 TO KM 79.700 IN THE STATE OF WEST BENGAL ON EPC MODE & (II) WIDENING AND UP-GRADATION OF EXISTING CARRIAGEWAY INTO 2-LANE WITH PS CONFIGURATION FROM RESHI TO RHENOCK FROM CH. 96.254 TO CH. 101.554 ALONG NH- 717A IN THE STATE OF SIKKIM ON EPC MODE | Sikkim | 13-10-2025 20:30:00 | View Details | ||
3 | CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION AND UPGRADATION OF EXISTING ROAD ON NH-510 BETTWEEN RABANGLA TO GYALSHING TO 2-LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF SIKKIM UNDER SARDP-NE PHASE ‘A’ ON EPC MODE: (1) KM 32.500 TO KM 33.600 (PACKAGE-III) (2) KM 33.600 TO KM 58.840 (PACKAGE-IV) (3) KM 58.840 TO KM 75.00 (PACKAGE-V) (4) KM 75.000 TO KM 90.210 (PACKAGE-VI) | Sikkim | 13-10-2025 20:30:00 | View Details | ||
4 | Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode | Ladakh | 06-10-2025 20:30:00 | View Details | ||
5 | Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 66.110 to km 101.280 (PKG-IV) in the state of Manipur on EPC mode. (ii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 101.280 to km 131.280 (PKG-V) in the state of Manipur on EPC mode. (iii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 131.280 to km 169.570 (PKG-VI) in the state of Manipur on EPC mode. (iv) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 169.570 to km 205.974 (PKG-VII) in the state of Manipur on EPC mode. | Manipur | 24-09-2025 20:30:00 | View Details | ||
6 | Restoration & Repair work on NH-208 from km 0.000 to km 18.600 (Total Length – 18.600 Km) at various sections of Kumarghat to Kailashahar road at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis | Tripura | 23-09-2025 19:30:00 | View Details | ||
7 | Construction of 2 Nos. of Major Bridge at Km. 508+414 and Km 523+271 in Jhanji to Demow section of NH37(Old) in State of Assam in FY:25-26 | Assam | 22-09-2025 22:30:00 | View Details | ||
8 | Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT of Jammu & Kashmir on EPC Mode | Union Territory of Jammu and Kashmir | 22-09-2025 16:30:00 | View Details | ||
9 | One Time Improvement of the Bypassed section of Biswanath Chariali Town portion from Ch 201.100 to Ch 206.200 of NH-15 on Item rate basis in the State of Assam in FY-25-26 | Assam | 18-09-2025 22:30:00 | View Details | ||
10 | Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode | Union Territory of Jammu and Kashmir | 16-09-2025 16:30:00 | View Details |