Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
1931 |
RFP for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I). Click Here | Nagaland | 20-08-2021 |
1932 |
RFP for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. (ii) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River (Package-6) on EPC mode. Click Here | Manipur | 20-08-2021 |
1933 |
LOI For “Consultancy Services for Preparation of Detailed Project Report (DPR) for Development of self sustainable Bus Port at Pune in the State of Maharashtraâ€. Click Here | Maharashtra | 23-08-2021 |
1934 | RFP for RFP for the hiring of office space on lease basis for a period of 06 month for its Site Office - Changki (Dist- Mokokchung), Nagaland. Click Here | Nagaland | 23-08-2021 |
1935 | RFP for RFP for the hiring of office space on lease basis for a period of 06 month for its Site Office - Tuensang (Chare) (Dist- Tuensang), Nagaland. Click Here | Nagaland | 23-08-2021 |
1936 |
RFP for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A†in the state of Meghalaya on EPC mode (Package-I). Click Here | Meghalaya | 23-08-2021 |
1937 |
RFP for Hiring of 01 Nos of Vehicle on Monthly Basis for NHIDCL, Site Office-Peren in the state of Nagaland – 5th Call. Click Here | Nagaland | 24-08-2021 |
1938 |
RFP for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 16.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22-2 nd Call. Click Here | Sikkim | 24-08-2021 |
1939 |
RFP for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village – Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode. Click Here | Assam | 24-08-2021 |
1940 |
RFP for Consultancy services as Authority\'s Engineer for supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of Jammu & Kashmir and Ladakh. Click Here | Union Territory of Jammu and Kashmir | 24-08-2021 |