Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
1891 | RFP for Hiring of 01 no. of Vehicle (Top Model 4x4 drive or equivalent, i.e., Bolero, Scorpio, Duster, Thar or equivalent) on Monthly Basis for SO Losami, under PMU-Pfutsero, NHIDCL, in the state of Nagaland. (1 st Call) Click Here | Nagaland | 30-07-2021 |
1892 | RFP FOR HIRING OF 3 (THREE) VEHICLES ON MONTHLY BASIS FOR NHIDCL _BMU/UKfIRUL. MANIPUR. Click Here | Manipur | 31-07-2021 |
1893 |
RFP for Special Repairs of NH-6 from Dulte to Champhai (km 69.000 to km 150.000) [Total Length 81.000 km] (Package- 1) in the State of Mizoram in FY 2021-22 (Item Rate & Work Order Basis) (4th Call) . Click Here | Mizoram | 02-08-2021 |
1894 |
RFP for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. Click Here | Manipur | 02-08-2021 |
1895 |
RFP for Selection of Manpower Placement Agency for providing services of Un-skilled, semi-skilled and skilled manpower on monthly basis for NHIDCL in the State of Assam. Click Here | Assam | 02-08-2021 |
1896 |
RFP for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridge across Tuivai River at Manipur Mizoram Border) to Km 119.108 (Near Keifang Village) [Design Chainage Km 0.000 to Km 98.579] (Package-I, II & III) in the State of Mizoram under Bharatmala Pariyojna on EPC modeâ€. Click Here | Mizoram | 02-08-2021 |
1897 |
RFP for Construction, Supply, Transportation, Installation, Testing and Commissioning of Steel Pontoons and Gangways using suitable Steel Enveloped HDPE / FRP floating material for providing floating Terminal facilities at various locations on NW – 2 (Brahmaputra River) on EPC mode. Click Here | Assam | 04-08-2021 |
1898 |
RFP for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction & Upgradation to 2 lane with paved shoulder from Design Km. 67.805 (at the end of Km 83rd tunnel near Dhrabshala) to Km 80.675 (Dulhasti) of 12.87 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –III). & (II) Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani – Kishtwar – Chattroo section and a link road to Kishtwar town of 1.871 km on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –IV). & (III) Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.06 (Chattroo) of 15.52 Km length on Khellani – Kishtwar –Chattroo section on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –V). Click Here | Union Territory of Jammu and Kashmir | 04-08-2021 |
1899 |
RFP for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands; 5th Call. Click Here | Union Territory of Andaman and Nicobar | 05-08-2021 |
1900 |
RFP for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi - Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Click Here | Manipur | 05-08-2021 |