Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
1581 |
RFP for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –II). Click Here | Union Territory of Jammu and Kashmir | 08-03-2021 |
1582 |
RFP for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 67.805 (at the end of Km 83rd tunnel near Dhrabshala) to Km 80.675 (Dulhasti) of 12.87 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –III). Click Here | Union Territory of Jammu and Kashmir | 08-03-2021 |
1583 |
RFP for Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.08 (Chattroo) of 15.54 Km length on Khellani – Kishtwar – Chattroo section on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –V). Click Here | Union Territory of Jammu and Kashmir | 08-03-2021 |
1584 |
RFP for Hiring of Vehicles on Monthly Basis For RO- Gangtok, NHIDCL. Click Here | Sikkim | 08-03-2021 |
1585 |
RFP for Appointment of Financial Consultancy Services for Agartala to Sabroom section of NH-08 from CH 6.8 Km to 128.712 Km including Feni Bridge at international border of India and Bangladesh in the state of Tripura undertaken by NHIDCL on OMT basis. Click Here | Tripura | 08-03-2021 |
1586 |
RFP for Construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 26.400 to Km 37.420 [Pkg-3] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Click Here | Mizoram | 09-03-2021 |
1587 |
RFP for Construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 13.300 to Km 26.400 [Pkg-2] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Click Here | Mizoram | 09-03-2021 |
1588 |
RFP for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 61.920 to Km 74.950 [Pkg-6] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Click Here | Mizoram | 09-03-2021 |
1589 |
RFP for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 50.700 to Km 61.920 [Pkg-5] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Click Here | Mizoram | 09-03-2021 |
1590 |
RFP for Strengthening of entrusted section of NH 208 from (Kalyanpur) to (Khowai Chowmuhuni, Teliamura) (Km. 124.000 to Km. 139.600) [Total Length 15.600 Km.] in the State of Tripura in the FY 2021-22. Click Here | Tripura | 09-03-2021 |