RFP for Construction of upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phase ‘Ã’ in the State of Sikkim (Package –I : Rhenok to Pakyong - 26.706 Kms) On Engineering, Procurement & Construction (EPC) Mode. Click Here
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) Construction of 1000m length Viaduct at Rangpo between Km 51.1 0 to Km 53.90 on Sevoke - Gangtok Road NH-10 (Old NH- 31A) in the State of West Bengal/Sikkim. (ii)Construction of upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok- Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phase ‘Ã’ in the State of Sikkim. (iii) Construction/upgradation of existing road to 2-lane with paved shoulders including geometric improvement of NH-510 from Km 0.00 to Km 32.5 (Singtam-Tarku-Rabongla-Legship-Gyalshing) on EPC basis under SARDP-NE Phase ‘A’ in the State of Sikkim. Click Here
Request for Proposal Short Term Improvement & Routine Maintenance of Km 51.00 to Km 93.00 of NH-10 in the State of Sikkim (Including Indra and Northern Bypass) on Percentage Rate basis. Click Here
Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of Demwe-Brahmkund Section from Km. 0.00 to Km. 19.22 and Arrowa-Khupa-Hayuliang section from Km. 44.02 to Km 80.97, total length for both is 56.17 Km of Demwe-Hawai Road under SARDP-NE on Engineering, Procurement and Construction mode in the state of Arunachal Pradesh. (Retender). Click Here
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration from Simaluguri-Bihubar on NH-702C in the State of Assam to Mon on NH 702 in the state of Nagaland on Engineering, Procurement and Construction mode. Click Here
Construction of Meka-Roing- Hunli from existing km 16 of Roing Hunli Road to km 21.5 of Hunli-Anini Road (total length=74.863 km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis. Click Here
Two-Laning of Existing Khupa - Hayuliang – Hawai Road on EPC basis from design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of (Khupa – Hayuliang Road) to Km 8.970 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh Under SARDP-NE, Project Highway. Click Here
Two-Laning of Existing Hayuliang – Hawai Road on EPC basis from design Km. 17.000 (Khupa) to Km. 34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh under SARDP-NE, Project Highway. Click Here
Two-Laning of Existing Hayuliang – Hawai Road on EPC basis from Design Km. 34.000 to Km. 51.825 [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh Under SARDP-NE, Project Highway. Click Here
Two-Laning of Hayuliang– Hawai bypass Road on EPC basis from design Km. 51.825 to Km. 63.131 Existing Km 45.050 of Hayuliang – Hawai road to Hawai Town in the state of Arunachal Pradesh Under SARDP-NE. Click Here