Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Tender ID | View Details |
|---|---|---|---|---|---|
| 1 | One-Time Improvement Between Dulte -Champhai Road (Nh-06) From Old Existing Chainage Km 70+000 To Km 92+165 & Km 106+000 To Km 146+450 (Single Lane) in The State Of Mizoram | Mizoram | 27-08-2026 17:00:00 | View Details | |
| 2 | Construction of Remedial Measures for treatment of Sinking Zone at 72 locations in between Km 85+000 to Km 95+000 & Km 101+000 to Km 145+000 of Tura-Dalu section of NH-217 (old NH-51) in the State of Meghalaya on EPC Mode | Meghalaya | 24-08-2026 15:00:00 | 2026_NHIDC_916574_1 | View Details |
| 3 | Consultancy services for preparation of Detailed Project Report and preconstruction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Dehradun-Nainital in the State of Uttarakhand (2nd Call) | Uttarakhand | 15-08-2026 15:00:00 | 2026_NHIDC_915380_1 | View Details |
| 4 | Providing & supplying of vehicle 1 nos. on monthly basis for SO-Teesta under PMU - Siliguri, NHIDCL in the State of West Bengal | West Bengal | 07-08-2026 15:00:00 | View Details | |
| 5 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-4: From Km 133+320 to Km 164+355, Design Length – 31.035 Km) | Assam | 06-08-2026 15:00:00 | View Details | |
| 6 | Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Rhenock (existing Km 0.000) to Rongli Bazaar (existing Km 15.300) along NH-717B in the State of Sikkim on EPC mode | 06-08-2026 15:00:00 | View Details | ||
| 7 | Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Rhenock (existing Km 0.000) to Rongli Bazaar (existing Km 15.300) along NH-717B in the State of Sikkim on EPC mode | Sikkim | 06-08-2026 15:00:00 | View Details | |
| 8 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-3: From Km 78+600 to Km 133+320, Design Length – 54.720 Km). | Assam | 03-08-2026 15:00:00 | View Details | |
| 9 | Independent Engineer Services for “Development, maintenance, management and operation of Greenfield High-Speed Corridor of 164.3550 km (NH-6) from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam on Hybrid Annuity Mode”. | Meghalaya | 03-08-2026 15:00:00 | View Details | |
| 10 | Maintenance of the existing road of the project “Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-3, length- 34.494Km) from Design Chainage 75.000 Km to Km 109.434 on NH-129A in the State of Manipur on EPC mode.” at the risk & cost of the EPC Contractor | Manipur | 27-07-2026 15:00:00 | View Details |