Technical Evaluation Result for Improvement to 2 Lane with paved shoulder / 4 lane of NH-40 section from Km 151+330 to Km 163+400 (design Km 63+530 to Km 71+520) design length 7.99 Km in the State of Meghalaya on EPC Mode under JICA loan Assistance (Packa Read more about Technical Evaluation Result for Improvement to 2 Lane with paved shoulder / 4 lane of NH-40 section from Km 151+330 to Km 163+400 (design Km 63+530 to Km 71+520) design length 7.99 Km in the State of Meghalaya on EPC Mode under JICA loan Assistance (Packa
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call. Dated: 06-11-2020. Read more about Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call. Dated: 06-11-2020.
Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands. Dated: 05-11-2020. Read more about Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands. Dated: 05-11-2020.
Technical Evaluation Result for Slope Protection work at 02 Locations (km 72.00 and km 72.80), in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call.. Dated: 05-11- Read more about Technical Evaluation Result for Slope Protection work at 02 Locations (km 72.00 and km 72.80), in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call.. Dated: 05-11-
Technical Evaluation Result for Slope Protection work at km 71.720, in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call. Dated: 05-11-2020. Read more about Technical Evaluation Result for Slope Protection work at km 71.720, in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call. Dated: 05-11-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement/Widening to 2 Lane with Earthen Shoulder of Ranikor-Maheshkola-Baghmara road section (i) Package-IV from Kanai to Rongara, existing chainage from Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement/Widening to 2 Lane with Earthen Shoulder of Ranikor-Maheshkola-Baghmara road section (i) Package-IV from Kanai to Rongara, existing chainage from
Technical Evaluation Result for Design, Engineering, Procurement, Supply and Construction of Four lane Bridge including Approaches over River Brahmaputra between Dhubri on the North Bank and Phulbari on the South Bank in the state of Assam / Meghalaya on Read more about Technical Evaluation Result for Design, Engineering, Procurement, Supply and Construction of Four lane Bridge including Approaches over River Brahmaputra between Dhubri on the North Bank and Phulbari on the South Bank in the state of Assam / Meghalaya on
Technical Evaluation Result for Ordinary Repair of NH -37 of Imphal-Jiribam Road (Km 75.00 to Km 145.00) [Total Length = 70.00 Km] in the state of Manipur in the year 2020-2021(2nd call). Dated: 02-11-2020. Read more about Technical Evaluation Result for Ordinary Repair of NH -37 of Imphal-Jiribam Road (Km 75.00 to Km 145.00) [Total Length = 70.00 Km] in the state of Manipur in the year 2020-2021(2nd call). Dated: 02-11-2020.
Technical Evaluation Result for Construction of Jia Bharali Bridge along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715) in the State of Assam on EPC Mode. Dated: 29-10-2020. Read more about Technical Evaluation Result for Construction of Jia Bharali Bridge along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715) in the State of Assam on EPC Mode. Dated: 29-10-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement/Widening to 2 Lane with Earthen Shoulder of Ranikor-Maheshkola-Baghmara road section (i) Package-IV from Kanai to Rongara, existing chainage from Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement/Widening to 2 Lane with Earthen Shoulder of Ranikor-Maheshkola-Baghmara road section (i) Package-IV from Kanai to Rongara, existing chainage from