Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Jammu and Kashmir. Dated: 25-11-2020.

  • Read more about Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Jammu and Kashmir. Dated: 25-11-2020.

Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the State of Meghalaya. Dated: 24-11-2020.

  • Read more about Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the State of Meghalaya. Dated: 24-11-2020.

Technical Evaluation Result for the work of Improvement and widening to two lane with paved shoulder of road from Km 63.700 to Km 75.700 (Total length: 12.000 km) i.e. Bamanchara – Srirampur section of NH-208 (Package-IV) in the state of Tripura on EPC ba

  • Read more about Technical Evaluation Result for the work of Improvement and widening to two lane with paved shoulder of road from Km 63.700 to Km 75.700 (Total length: 12.000 km) i.e. Bamanchara – Srirampur section of NH-208 (Package-IV) in the state of Tripura on EPC ba

Technical Evaluation Result for the work of Improvement and widening to two-lane with paved shoulder of road from km 21.100 to km 29.200(Total length:8.100km) i.e. Kailashahar-Fultali section of NH-208(Package-I) in the state of Tripura on EPC basis. Date

  • Read more about Technical Evaluation Result for the work of Improvement and widening to two-lane with paved shoulder of road from km 21.100 to km 29.200(Total length:8.100km) i.e. Kailashahar-Fultali section of NH-208(Package-I) in the state of Tripura on EPC basis. Date

Technical Evaluation Result for the work of Improvement and widening to two-lane with paved shoulder of road from Km 29.200 to Km 49.200 (Total length: 20.000 km) i.e. Fultali – Jurichhara section of NH-208 (Package-II) in the state of Tripura on EPC basi

  • Read more about Technical Evaluation Result for the work of Improvement and widening to two-lane with paved shoulder of road from Km 29.200 to Km 49.200 (Total length: 20.000 km) i.e. Fultali – Jurichhara section of NH-208 (Package-II) in the state of Tripura on EPC basi

Technical Evaluation Result for the work of Improvement and widening to two lane with paved shoulder of road from Km 75.700 to Km 101.300 (Total length: 25.600 km) i.e. Srirampur – Khowai section of NH-208 (Package-V) in the state of Tripura on EPC basis.

  • Read more about Technical Evaluation Result for the work of Improvement and widening to two lane with paved shoulder of road from Km 75.700 to Km 101.300 (Total length: 25.600 km) i.e. Srirampur – Khowai section of NH-208 (Package-V) in the state of Tripura on EPC basis.

Technical Evaluation Result for work of Improvement and widening to two lane with paved shoulder of road from Km 49.200 to Km 63.700 (Total length: 14.500 km) i.e. Jurichhara – Bamanchara section of NH-208 (Package-III) in the state of Tripura on EPC basi

  • Read more about Technical Evaluation Result for work of Improvement and widening to two lane with paved shoulder of road from Km 49.200 to Km 63.700 (Total length: 14.500 km) i.e. Jurichhara – Bamanchara section of NH-208 (Package-III) in the state of Tripura on EPC basi

Final Composite Score for Selection of Manpower Placement Agency for providing services of Civil Engineers at NHIDCL Headquarters, New Delhi, its Site Offices, Project Monitoring Units (PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: 12-11

  • Read more about Final Composite Score for Selection of Manpower Placement Agency for providing services of Civil Engineers at NHIDCL Headquarters, New Delhi, its Site Offices, Project Monitoring Units (PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: 12-11

Technical Evaluation Result for Special repair of NH 202, Mokokchung-Tuensang Road (from Km 0.000 to 95.000 Km) [Total length – 95.00 Km] in the state of Nagaland for the FY 2020-21- (2nd Call). Dated: 09-11-2020.

  • Read more about Technical Evaluation Result for Special repair of NH 202, Mokokchung-Tuensang Road (from Km 0.000 to 95.000 Km) [Total length – 95.00 Km] in the state of Nagaland for the FY 2020-21- (2nd Call). Dated: 09-11-2020.

Technical Evaluation Result for Improvement to 2 lane with paved shoulder of NH-40 section from Km 93+490 to Km 123+800 (design Km 10+670 to Km 37+550) design length 26.55 km in the State of Meghalaya on EPC Mode under JICA Loan Assistance(Package-II ). D

  • Read more about Technical Evaluation Result for Improvement to 2 lane with paved shoulder of NH-40 section from Km 93+490 to Km 123+800 (design Km 10+670 to Km 37+550) design length 26.55 km in the State of Meghalaya on EPC Mode under JICA Loan Assistance(Package-II ). D

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 60
  • Page 61
  • Page 62
  • Page 63
  • Current page 64
  • Page 65
  • Page 66
  • Page 67
  • Page 68
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 195892