Current Tenders

Sr. No. Descriptions State Bid Due Date Sort ascending Tender ID View Details
1 One-Time Improvement Between Dulte -Champhai Road (Nh-06) From Old Existing Chainage Km 70+000 To Km 92+165 & Km 106+000 To Km 146+450 (Single Lane) in The State Of Mizoram Mizoram 27-08-2026 17:00:00 View Details
2 Construction of Remedial Measures for treatment of Sinking Zone at 72 locations in between Km 85+000 to Km 95+000 & Km 101+000 to Km 145+000 of Tura-Dalu section of NH-217 (old NH-51) in the State of Meghalaya on EPC Mode Meghalaya 24-08-2026 15:00:00 2026_NHIDC_916574_1 View Details
3 Consultancy services for preparation of Detailed Project Report and preconstruction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Dehradun-Nainital in the State of Uttarakhand (2nd Call) Uttarakhand 15-08-2026 15:00:00 2026_NHIDC_915380_1 View Details
4 Providing and supplying of vehicle 4 Nos. on monthly basis for NHIDCL PMU Office and Site Office - Darjeeling in the State of West Bengal. West Bengal 12-08-2026 11:00:00 View Details
5 Providing & supplying of vehicle 1 nos. on monthly basis for SO-Teesta under PMU - Siliguri, NHIDCL in the State of West Bengal West Bengal 07-08-2026 15:00:00 View Details
6 Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Rhenock (existing Km 0.000) to Rongli Bazaar (existing Km 15.300) along NH-717B in the State of Sikkim on EPC mode Sikkim 06-08-2026 15:00:00 View Details
7 Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-4: From Km 133+320 to Km 164+355, Design Length – 31.035 Km) Assam 06-08-2026 15:00:00 View Details
8 Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Rhenock (existing Km 0.000) to Rongli Bazaar (existing Km 15.300) along NH-717B in the State of Sikkim on EPC mode 06-08-2026 15:00:00 View Details
9 Providing the Services of Vehicle on Monthly Basis to NHIDCL, Project Monitoring Unit-Ranipool (Sikkim) Sikkim 05-08-2026 15:00:00 View Details
10 Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-3: From Km 78+600 to Km 133+320, Design Length – 54.720 Km). Assam 03-08-2026 15:00:00 View Details