Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
621 |
REQUEST FOR PROPOSAL (RFP) FOR “Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.592 to Km 29.530 [Design Km. 20+751 to Km. 35+461] (Design Length – 14+710 Km) in the state of Nagaland under SARDP-NE Phase Aâ€. Click Here | Nagaland | 07-02-2019 |
622 |
REQUEST FOR PROPOSAL (RFP) FOR “Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 20+751] (Design Length – 20.751 Km) in the state of Nagaland under SARDP-NE Phase Aâ€. Click Here | Nagaland | 07-02-2019 |
623 |
Request for Proposal (RFP) for Consultancy Services for Authority’s Engineer for Supervision of Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design Length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP-NE. Click Here | Manipur | 07-02-2019 |
624 | Expression of Interest (EOI) for Empanelment of leading Newspapers for publication of Tenders/Advertisement of NHIDCL Click Here | Delhi | 08-02-2019 |
625 |
RFP for “Construction of Two Lane “Chisopani Traffic Tunnel†of Length 250 mincluding approaches from Km 67+080 to Km 67+500 on NH-10 in East District of Sikkim State on EPC mode†Click Here | Sikkim | 11-02-2019 |
626 |
RFP FOR SHORT TERM IMPROVEMENT & ROUTINE MAINTENANCE FROM KM. 0.000 to KM. 16.000 OF NH-510 IN THE STATE OF SIKKIM ON ITEM RATE BASIS. Click Here | Sikkim | 11-02-2019 |
627 |
RFP for Consultancy Services for institutional strengthening of NHIDCL Click Here | Delhi | 14-02-2019 |
628 |
Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 0.00 to Design Km 14.00 (Design Length 14.00) in the State of Nagaland under SARDP-NE (Pkg-I) Click Here | Nagaland | 19-02-2019 |
629 |
Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 14.00 to Design Km 29.00 (Design Length 15.00) in the State of Nagaland under SARDP-NE (Pkg-II) Click Here | Nagaland | 19-02-2019 |
630 |
Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 29.00 to Design Km 44.525 (Design Length 15.525) in the State of Nagaland under SARDP-NE (Pkg-III) Click Here | Nagaland | 19-02-2019 |