Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
611 |
Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 80.000 to Km 170.000 (Kishtwar - Chatroo) on Batote-Kishtwar-Sinthanpass road in the State of Jammu & Kashmir(Package-II). Click Here | Union Territory of Jammu and Kashmir | 30-01-2019 |
612 |
Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 0.000 to Km 80.000 (Ramban - Doda) on Batote-Kishtwar-Sinthanpass road in the State of Jammu & Kashmir (Package-I). Click Here | Union Territory of Jammu and Kashmir | 30-01-2019 |
613 | RFP for Hiring of Pool Vehicle on Monthly Basis for NHIDCL Site Office Lunglei, Mizoram. Click Here | Mizoram | 30-01-2019 |
614 |
Consultancy Services for Authority’s Engineer for Supervision of “Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from (i) existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 20+751] (Design Length – 20.751 Km) and (ii) existing Km 16.592 to Km 29.530 [Design Km. 20.751 to Km. 35.461] (Design Length – 14.710 Km) in the state of Nagaland under SARDP-NE Phase Aâ€. Click Here | Nagaland | 31-01-2019 |
615 |
RFP for Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design length=37.97 Km) of NH-137 in the State of Manipur on EPC mode under SARDP-NE. Click Here | Manipur | 01-02-2019 |
616 |
Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir. Click Here | Union Territory of Jammu and Kashmir | 01-02-2019 |
617 | NOTICE INVITING TENDER FOR UNDERTAKING THE WORK OF VALUATION OF STRUCTURES FALLING IN THE STRETCH OF (a) BAGRAKOTE-KAFER SECTION OF NH-717A FROM KM 0 TO KM 40 (b) KAFER-RESHI SECTION OF NH-717A FROM KM 40 TO KM 98.515 (except Km 61 to Km 76.700) IN THE STATE OF WEST BENGAL. Click Here | West Bengal | 01-02-2019 |
618 |
RFP for “Construction of 2-Lane with Paved shoulder including geometric improvement from km 0.000 to km 16.000 of stretch Singtam – Tarku of NH 510 on EPC basis under SARDP –NE phase A in the state of Sikkim.†Click Here | Sikkim | 05-02-2019 |
619 |
RFP for “Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase„Ã‟ in the State of West Bengal (Package-IV A).†Click Here | West Bengal | 06-02-2019 |
620 | Delhi | 06-02-2019 |