Sorry, you need to enable JavaScript to visit this website.

Tender Archive

Bid Due Date
Sr. No.DescriptionSTATE / TERRITORYBID DUE DATESort ascending
541

    RFP For Clearance of landslides in soil, ordinary rock and hard rock from Km 0.000 to 25.000 on Batote-Kishtwar - Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Click Here

  • NIT
  • MOM
  • Technical Result
Union Territory of Jammu and Kashmir14-09-2018
542Assam17-09-2018
543

    RFP For Consultancy Service for Authority’s Engineer for (i) Construction of alternative highway (Package-IVA from 0.00 to 13.00 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (ii) Construction of alternative highway (Package-IVB from 13.00 to 25.60 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal  (iii) Construction of alternative highway (Package-IVD from 26.10 to 40.00 of Bagrakot- Kafer section of NH-717A on EPC mode in state of West Bengal (iv) Construction of  alternative highway (Package-IVC from 25.60 to 26.10 of Bagrakot-Kafer section of NH- 717A on EPC mode in state of West Bengal (v) Construction of Mechi Bridge and  Approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India under Engineering Procurement and Construction (EPC) Mode. Click Here

  • NIT
  • Corrigendum 1
  • Reply To Prebid Queries
  • Corrigendum 2
  • Technical Evaluation Result
  • Technical Evaluation Result
  • Technical Evaluation Result
  • Modified Technical Evaluation Result
West Bengal17-09-2018
544

    NOTICE INVITING QUOTATIONS FOR HIRING OF COMMERCIAL OFFICE VEHICLE FOR OFFICE USE AT NHIDCL BRANCH OFFICE, NORTH LAKHIMPUR Click Here

Arunachal Pradesh27-09-2018
545Nagaland03-10-2018
546

    RFP for hiring Camp Office for NHIDCL in Serchhip, Siaha and Lunglei, Mizoram Click Here

Mizoram03-10-2018
547Arunachal Pradesh04-10-2018
548

    RFP For Consultancy Service for Authority’s Engineer for (i) Construction / upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Ranipool to Pakyong from Km. 0.000 to Km. 16.167 of NH-717-A on EPC basis under SARDP-NE Phase ‘Á’ (ii) Improvement & Rehabilitation of existing Indira By-Pass road from Km 0.000 to km 10.117 on NH-10 (iii) Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 (iv) Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim and (v) PR for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim. Click Here

  • NIT
  • Corrigendum 1
  • Cancellation Notice
Sikkim09-10-2018
549Delhi10-10-2018
550Arunachal Pradesh10-10-2018