Sorry, you need to enable JavaScript to visit this website.

Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 20.456 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAN

Sub Title
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 20.456 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 15-03-2018
Year