| 171 |
Short Term Maintenance Contract for Hill cutting across the Chathe river at Ch 126.100 to Ch 126.200 in Dimapur Kohima road section on NH-29 in the state of Nagaland in FY: 2025-26 (Percentage Rate and work Order Basis)
|
Nagaland |
12-08-2025 |
|
|
View Details |
| 172 |
Consultancy service for Authority's Engineer for Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan
|
Tripura |
08-08-2025 |
|
|
View Details |
| 173 |
Short Term Maintenance for Landslide Debris Clearance from Km 368.00 to 468.00 of National Highway No.07 (Old NH-58) in the State of Uttarakhand (2nd Call).
|
Uttarakhand |
06-08-2025 |
21-08-2025 |
|
View Details |
| 174 |
Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 66.610 to km 101.280 (Existing Chainage from km 67.496 to km 103.557) (PKG-IV) in the state of Manipur on EPC mode. (ii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 101.280 to km 131.280 (Existing Chainage from km 103.557 to km 134.821) (PKG-V) in the state of Manipur on EPC mode. (iii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 131.280 to km 169.570 (Existing Chainage from km 134.821 to km 175.105) (PKG-VI) in the state of Manipur on EPC mode. (iv) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 169.570 to km 205.974 (Existing Chainage from km 175.105 to km 214.289) (PKG-VII) in the state of Manipur on EPC mode
|
Manipur |
06-08-2025 |
13-08-2025 |
|
View Details |
| 175 |
Specialized Slope Protection Work of Section from Km. 25.600 to Km. 26.100 (Bagrakot - Kafer) of NH - 717 A in the State of West Bengal on EPC mode (Pkg-IVC) [2nd Call]
|
West Bengal |
04-08-2025 |
26-08-2025 |
|
View Details |
| 176 |
Completion of Balance Work of Inland Waterway Terminal at Jogighopa at Risk & Cost of EPC Contractor (Installation of Fenders) in the state of Assam in the year 2025-26-2nd Call
|
Assam |
02-08-2025 |
|
|
View Details |
| 177 |
Completion of Balance Work of Inland Waterway Terminal at Jogighopa at Risk and Cost of EPC Contractor in the state of Assam in the year 2025-26-2nd Call
|
Assam |
02-08-2025 |
|
|
View Details |
| 178 |
“Hiring of Machinery for Clearance of Landslide and other associated works on project “Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210)
|
Sikkim |
31-07-2025 |
|
|
View Details |
| 179 |
Hiring of Machinery for Clearance of Landslide and other associated works on project “Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 58.840 to Km 75.000)
|
Sikkim |
31-07-2025 |
|
|
View Details |
| 180 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane with Paved Shoulder, High Speed Corridor from Guwahati (near Jorabat) to Barapani ( near Mawlyngkhung) in the State of Meghalaya
|
Meghalaya |
30-07-2025 |
|
|
View Details |