171 |
Expression of Interest for Empanelment of Tunnel Expert
|
Delhi |
30-10-2024 |
|
View Details |
172 |
Balance work for construction of 2-Lane with Hard Shoulders of Demwe-Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh non EPC Mode under NH(O)-NE
|
Arunachal Pradesh |
28-10-2024 |
|
View Details |
173 |
Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect to Up gradation of existing 2L+PS of Agartala-Udaipur section to 4L+PS from Km 6.800 to Km 55.00 of NH-08 in the state of Tripura on EPC basis.
|
Tripura |
25-10-2024 |
|
View Details |
174 |
Restoration and Repair of PagalNallah Site from Km 454+300 to Km 454+420 of NH-07 (Chamoli District) in the state of Uttarakhand.
|
Uttarakhand |
22-10-2024 |
|
View Details |
175 |
Consultancy Services as Authority’s Engineer for Supervision during O&M period for “(i) 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH-10 (Old NH-31A) in the State of West Bengal/Sikkim (ii) 2-lane with paved shoulder road from km 0.000 to km 26.706 in Rhenock-Rorathang-Pakyong of NH 717-A in the state of Sikkim (iii) Two Lane “Chisopani Traffic Tunnel” of length 250m including approaches from Km 67.080 – Km 67+500 on NH-10 in East District of Sikkim (iv) 2-lane with paved shoulders road from km 0.00 to km 16.00 (Singtam-Tarku) of NH-510 in the State of Sikkim (Package-I) & (v) 2-lane with paved shoulders road from km 16.00 to km 32.50 (Tarku-Ravangla) of NH-510 in the State of Sikkim (Package-II)\\\" on EPC Basis
|
Sikkim |
21-10-2024 |
|
View Details |
176 |
Short Term Maintenance Contract of NH39 New NH02 from Kohima to Mao Stretch from Km 194.000 to Km 212.334 Length 18.334 Km in the State of Nagaland in the FY 2024-25 Percentage Rate and Work Order Basis, at Risk and Cost of EPC Contract
|
Nagaland |
19-10-2024 |
|
View Details |
177 |
Special Repair works to restore road formation width breached at Km 15+700 near Harishnagar Tea Garder with essential protective works and pavement works of NH-08 stretch from Agartala to Udaipur (6.800 to 55.000) in the State of Tripura in the FY 2024-25
|
Tripura |
18-10-2024 |
|
View Details |
178 |
Repair of road from design Km 46.597 to Km 66.845 (Total Length: 20.248 Km) of NH-44A Kanchanpur to Vaghmun section at Risk and Cost of the EPC Contractor on item rate basis & work order basis in F.Y 2024- 25.
|
Tripura |
18-10-2024 |
|
View Details |
179 |
Supply and Installation of Furniture, kitchen platform, wall cabinet, room heaters, Bukhari, mattress, blankets ,bedsheets, pillow etc at each locations in the State of Himachal Pradesh and Uttarakhand on rate contract basis.
|
Uttarakhand |
18-10-2024 |
|
View Details |
180 |
Supply and Installation of 02 nos Diesel Generator set of 10 KVA each along with 2 kW Solar Off-Grid System including 5 years maintenance at each locations in the State of Himachal Pradesh and Uttarakhand on rate contract basis.
|
Uttarakhand |
18-10-2024 |
|
View Details |