| 141 |
Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 66.110 to km 101.280 (PKG-IV) in the state of Manipur on EPC mode. (ii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 101.280 to km 131.280 (PKG-V) in the state of Manipur on EPC mode. (iii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 131.280 to km 169.570 (PKG-VI) in the state of Manipur on EPC mode. (iv) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 169.570 to km 205.974 (PKG-VII) in the state of Manipur on EPC mode.
|
Manipur |
24-09-2025 |
|
|
View Details |
| 142 |
Restoration & Repair work on NH-208 from km 0.000 to km 18.600 (Total Length – 18.600 Km) at various sections of Kumarghat to Kailashahar road at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis
|
Tripura |
23-09-2025 |
|
|
View Details |
| 143 |
Construction of 2 Nos. of Major Bridge at Km. 508+414 and Km 523+271 in Jhanji to Demow section of NH37(Old) in State of Assam in FY:25-26
|
Assam |
22-09-2025 |
|
|
View Details |
| 144 |
Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT of Jammu & Kashmir on EPC Mode
|
Union Territory of Jammu and Kashmir |
22-09-2025 |
29-09-2025 |
|
View Details |
| 145 |
One time improvement of Chandipur-Kanchanpur road of NH-44A from Km 75.500 to Km 86.000 in the state of Tripura in the FY 2025-26 on item rate basis & work order basis (Balance Work).
|
Tripura |
20-09-2025 |
|
|
View Details |
| 146 |
One Time Improvement of the Bypassed section of Biswanath Chariali Town portion from Ch 201.100 to Ch 206.200 of NH-15 on Item rate basis in the State of Assam in FY-25-26
|
Assam |
18-09-2025 |
|
|
View Details |
| 147 |
Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode
|
Union Territory of Jammu and Kashmir |
16-09-2025 |
|
|
View Details |
| 148 |
Notice lnviting Bid for Renting Office Premises of NHIDCL, PMU-Shillong, in the State of Meghalaya
|
Meghalaya |
15-09-2025 |
13-10-2025 |
|
View Details |
| 149 |
Short Term Maintenance Contract (STMC) for the section (i) Km 96.254 (Rishi Border) to Km 101.554 (Rhenock Charpatak) of NH-717A, & (ii) Km 0.000 (Rhenock Charpatak) to Km 15.300 (Rongli Bazaar) of NH-717 B (total length of 20.600) under jurisdiction of PMU-Rhenock, NHIDCL on Percentage Rate Contract Basis for FY 2025-26 in the state of Sikkim
|
Sikkim |
15-09-2025 |
|
|
View Details |
| 150 |
Supply & Installation of Instruments, Web Based Monitoring of PagalNallah Landslide site (Km 454+300) on NH-07 in Chamoli District in the state of Uttarakhand.
|
Uttarakhand |
15-09-2025 |
17-10-2025 |
|
View Details |