Sorry, you need to enable JavaScript to visit this website.

Tender Archive

Bid Due Date
Sr. No.DescriptionSTATE / TERRITORYBID DUE DATESort ascending
2961

    RFP for the hiring of office space on lease basis for NHIDCL PMU-Mon (Dist–Mon), Nagaland-1st Call-reg. Click Here

Nagaland10-08-2023
2962

    RFP for Hiring of 1 nos. vehicle SUV for GM (P) on monthly basis under NHIDCL, PMU-Dimapur Nagaland. Click Here

Nagaland11-08-2023
2963

    RFP for Hiring of 1 no. I ns pec ti o n Ve hi c l e S UV on monthly basis for NHIDCL, PMU-Dimapur Nagaland. Click Here

Nagaland11-08-2023
2964Union Territory of Jammu and Kashmir14-08-2023
2965

    RFP for Balance work of Construction of two -Lane with hard shoulders of Kohima –Jessami road on NH-29 from existing Km 98.38 to existing Km 120.367 (Design Km 95.70 to Km 117.20) Design Length 21.50Km (Package-V) under Bharatmala Pariyojana on EPC mode -2nd Call Click Here

  • NIT
  • DCA
  • Schedules
  • Corrigendum No. 1
Nagaland14-08-2023
2966Assam14-08-2023
2967

    RFP for Restoration & Repair of Kohima to Jessami road on NH-29 from existing Km 98.38 to existing Km 120.367 (Design Km 95.70 to Km 117.200) (Length – 21.500 Km) (Package-V) in the State of Nagaland” - (Percentage Rate and Work Order Basis)-4th Call Click Here

  • NIT
  • Cancellation Notice
Nagaland14-08-2023
2968Union Territory of Jammu and Kashmir16-08-2023
2969Meghalaya16-08-2023
2970

    RFP for Restoration & Repair of Merangkong-Tamlu-Mon Road from Design chainage KM 59.000 to KM 86.835 (Existing KM 60.345 to KM 98.065) (Length - 23.035KM) (Pkg.-IV) & from Design chainage KM 59.000 to KM 72.450 (Length - 13.450 KM) (Pkg.-V) in the State of Nagaland” - (Percentage Rate and Work Order Basis)-2nd Call Click Here

  • NIT
  • Technical Evaluation Result
  • Cancellation Notice
Nagaland18-08-2023