Sorry, you need to enable JavaScript to visit this website.

Tender Archive

Bid Due Date
Sr. No.DescriptionSTATE / TERRITORYBID DUE DATESort ascending
2371Assam09-05-2022
2372Assam09-05-2022
2373

    RFP for RFP for Hiring of 01 No. Vehicle on Monthly Basis SUV Vehicle INNOVA CRYSTA Top-end model for NHIDCL, Regional Office-Dehradun in the State of Uttarakhand. Click Here

Uttarakhand09-05-2022
2374

    RFP for Maintenance & Repair of NH-08 in selected stretches of Km 388.700 to Km 390.900, Km 392.100 to Km 393.400 & Km 394.667 to Km 395.000 (Total length = 3.833 km) including laying of 30 mm BC and Placing of paver block in city portion on each side (400) mtr length & Construction of RCC Drain of length of 206 m at Ambassa Town in the State of Tripura on percentage rate basis. Click Here

  • NIT
Tripura09-05-2022
2375

    RFP for Hiring of Pool Vehicle (1 No.) on monthly basis for 1 year contract at NHIDCL, PMU-Lunglei, Mizoram. Click Here

Mizoram09-05-2022
2376Mizoram10-05-2022
2377

    RFp for Restoration & Rehabilitation of Ukhrul-Toloi-Tadubi Road from Km 0.00 to Km 60.00 covering length 60 Km on NH-102A in the state of Manipur in the year 2021-2022 on Item Rate Basis (8 th Call). Click Here

  • NIT
  • Corrigendum-I
Manipur10-05-2022
2378

    RFP for Restoration &Rehabilitation of Ukhrul-Toloi-Tadubi road section from Km 60.00 to Km 115.00 covering Km 55.00 length on NH-102A in the state of Manipur in the year 2021-2022 on Item Rate Basis (10th Call). Click Here

  • NIT
  • Corrigendum-I
Manipur10-05-2022
2379

    RFP for Providing & supplying of commercial vehicle 5 Nos. (01 Toyota Innova Crysta, 01 Scorpio and 01 Bolero for PMU-Doda and 01 Scorpio and 01 Bolero for SO-Khellani) on monthly basis for NHIDCL in the UT of Jammu & Kashmir. Click Here

  • NIT
  • Corrigendum-I
Union Territory of Jammu and Kashmir10-05-2022
2380

    RFP for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3) in the State of Manipur on EPC Mode; (ii) Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from Design Chainage 81.870 km to 105.825 km (Package-4) in the State of Manipur on EPC Mode. Click Here

  • NIT
  • Technical Evaluation Result
  • Final Technical Evaluation Result
Manipur11-05-2022