Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
2161 |
RFP for Construction of Link road Docs Chutumail Yourbaltak Kargil for Rural Development Department in the UT of Ladakh (2nd call ). Click Here | Union Territory of Ladakh | 25-11-2021 |
2162 | RFP for Hiring of Vehicles on Monthly Basis- 2nd Call For PMU ANINI & Site Office Roing, Arunachal Pradesh. Click Here | Arunachal Pradesh | 25-11-2021 |
2163 | RFP for Hiring of Vehicles on Monthly Basis- 2nd Call For SO-Etalin & SO-Hunli Under NHIDCL PMU-Anini, Arunachal Pradesh. Click Here | Arunachal Pradesh | 25-11-2021 |
2164 | RFP for Hiring of Vehicles on Monthly Basis- 3rd Call For Site Office Mipi Under NHIDCL PMU-Anini, Arunachal Pradesh. Click Here | Arunachal Pradesh | 25-11-2021 |
2165 |
RFP for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 00+000 to Km 21+350 (Design KM 00+000 to Km 21+200) of Paikan - Tura Package-1 of NH 217 in the state of Assam on EPC mode. Click Here | Assam | 25-11-2021 |
2166 |
RFP for Construction of Balance Work of 2 Lane with Paved Shoulders of Joram- Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Arunachal Pradesh under SARDP-NE. Click Here | Arunachal Pradesh | 25-11-2021 |
2167 |
RFP for For Hiring of Vehicles on Monthly Basis For RO- Gangtok, Sikkim. Click Here | Sikkim | 25-11-2021 |
2168 | RFP for Hiring of 01 no. of Vehicle (Top Model 4x4 drive or equivalent, i.e., Bolero, Scorpio, Duster, Thar or equivalent) on Monthly Basis for SO Losami, under PMU-Pfutsero, NHIDCL, in the state of Nagaland. (1 st Call). Click Here | Nagaland | 26-11-2021 |
2169 |
RFP for Providing & supplying of commercial vehicle 1 No. (01 Mahindra Scorpio/TUV 300/Bolero) on monthly basis for NHIDCL Site Office Maram in the State of Manipur. Click Here | Manipur | 26-11-2021 |
2170 |
RFP for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3) in the State of Manipur on EPC Mode; (ii) Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from Design Chainage 81.870 km to 105.825 km (Package-4) in the State of Manipur on EPC Mode. Click Here | Manipur | 26-11-2021 |