Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
1991 | RFP for RFP for Hiring of 01 no. of Vehicle on Monthly Basis for General Manager (Project), NHIDCL, PMU- Mokokchung in the State of Nagaland. Click Here | Nagaland | 15-09-2021 |
1992 | RFP for RFP for Hiring of 01 no. of Vehicle on Monthly Basis for, NHIDCL, Site Office - Mon in the State of Nagaland. Click Here | Nagaland | 15-09-2021 |
1993 | RFP for : RFP for Hiring of 01 no. of Vehicle on Monthly Basis for, NHIDCL, PMUMokokchung in the State of Nagaland. Click Here | Nagaland | 15-09-2021 |
1994 |
RFP for Development of Bus Port at Ramnagar in the State of Uttarakhand on Design, Finance, Build, Operate and Transfer (DFBOT) Mode. Click Here | Uttarakhand | 16-09-2021 |
1995 |
RFP for Maintenance and Repair of NH-6 from Mawryngkneng to Jowai road stretch from existing Ch. Km 35.000 to Km 54.000 including Jowai Bypass (0.000 to 8.000 Km) [Total Length 27.00 km] in the State of Meghalaya in FY 2021-22 (Item Rate & Work Order Basis). Click Here | Meghalaya | 16-09-2021 |
1996 | RFP for Maintenance and Repair of NH-40 from Lad Umroi to KHADC road stretch from existing Ch. Km 61.800 to Km 78.000 [Total Length 16.20 km] in the State of Meghalaya in FY 2021-22 (Item Rate & Work Order Basis). Click Here | Meghalaya | 16-09-2021 |
1997 |
RFP for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunachal Pradesh on EPC Mode under SARDP-3 rd call. Click Here | Arunachal Pradesh | 16-09-2021 |
1998 |
RFP for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A†in the state of Meghalaya on EPC mode (Package-I). Click Here | Meghalaya | 16-09-2021 |
1999 |
RFP for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani-Khanabal section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode.(Pkg-VI). & (II) Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Ashajipora) of 8.470km length i.e. to connecting NH-244 & NH-44 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VII) & (III) Strengthening & Upgradation of existing carriageway to intermediate lane from Km.0.00 to Km.42.820 of length 42.820 Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Click Here | Union Territory of Jammu and Kashmir | 16-09-2021 |
2000 |
RFP for Repair and Maintenance from Lalchara to Tuichanda Section (Old Alignment of Lalchara-Chandipur road) of NH-44A (Total Length: 12.000 Km) in the state of Tripura (Pkg-01) on percentage rate basis. Click Here | Tripura | 17-09-2021 |