1991

    RFP for RFP for Hiring of 01 no. of Vehicle on Monthly Basis for General Manager (Project), NHIDCL, PMU- Mokokchung in the State of Nagaland. Click Here

Nagaland15-09-2021
1992

    RFP for  RFP for Hiring of 01 no. of Vehicle on Monthly Basis for, NHIDCL, Site Office - Mon in the State of Nagaland. Click Here

Nagaland15-09-2021
1993

    RFP for : RFP for Hiring of 01 no. of Vehicle on Monthly Basis for, NHIDCL, PMUMokokchung in the State of Nagaland. Click Here

Nagaland15-09-2021
1994

    RFP for Development of Bus Port at Ramnagar in the State of Uttarakhand on Design, Finance, Build, Operate and Transfer (DFBOT) Mode. Click Here

  • NIT
  • DCA
  • Schedules
Uttarakhand16-09-2021
1995

    RFP for Maintenance and Repair of NH-6 from Mawryngkneng to Jowai road stretch from existing Ch. Km 35.000 to Km 54.000 including Jowai Bypass (0.000 to 8.000 Km) [Total Length 27.00 km] in the State of Meghalaya in FY 2021-22 (Item Rate & Work Order Basis). Click Here

  • NIT
Meghalaya16-09-2021
1996

    RFP for Maintenance and Repair of NH-40 from Lad Umroi to KHADC road stretch from existing Ch. Km 61.800 to Km 78.000 [Total Length 16.20 km] in the State of Meghalaya in FY 2021-22 (Item Rate & Work Order Basis). Click Here

Meghalaya16-09-2021
1997

    RFP for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunachal Pradesh on EPC Mode under SARDP-3 rd call. Click Here

  • NIT
  • DCA
  • Schedules
  • GAD
  • Corrigendum-I
  • Technical Evaluation Result
Arunachal Pradesh16-09-2021
1998Meghalaya16-09-2021
1999

    RFP for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani-Khanabal section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode.(Pkg-VI). & (II) Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Ashajipora) of 8.470km length i.e. to connecting NH-244 & NH-44 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VII) & (III) Strengthening & Upgradation of existing carriageway to intermediate lane from Km.0.00 to Km.42.820 of length 42.820 Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Click Here

  • NIT
  • Amendment-I
  • Amendment-II
  • Technical Evaluation Result
Union Territory of Jammu and Kashmir16-09-2021
2000

    RFP for Repair and Maintenance from Lalchara to Tuichanda Section (Old Alignment of Lalchara-Chandipur road) of NH-44A (Total Length: 12.000 Km) in the state of Tripura (Pkg-01) on percentage rate basis. Click Here

  • NIT
  • Corrigendum-I
  • Corrigendum-II
Tripura17-09-2021