Sorry, you need to enable JavaScript to visit this website.

Tender Archive

Sr. No.DescriptionSTATE / TERRITORYBID DUE DATESort ascending
1821Union Territory of Jammu and Kashmir15-06-2021
1822Sikkim15-06-2021
1823

    RFP for Maintenance and Repair of Ext. NH 51 from Paikan to  Tura (Km 25.000 to Km 35.000) [Total Length 10.00 km]  in the State of Meghalaya in FY 2021-22 (Item Rate &  Work Order Basis). Click Here

  • NIT
Meghalaya15-06-2021
1824

    RFP for Maintenance and Repair of State Road from Nengkra to Williamnagar-Williamnagar Junction (Km 0.000 to Km  21.200) [Total Length 21.20 km] in the State of Meghalaya in FY 2021-22 (Item Rate & Work Order Basis). Click Here

  • NIT
  • Annulment Notice
Meghalaya15-06-2021
1825Manipur16-06-2021
1826

    RFP for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder  from KM 51+246to Km 66+000 (Design Chainage 50+710 to  65+923) of Parokhuwa – Dokmoka Section(Package 2) of NH 29 in  the state of Assam on EPC mode. Click Here

  • NIT
  • Corrigendum-I
  • Corrigendum-II
  • Technical Evaluation Result
Assam17-06-2021
1827

    RFP forConsultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of TulungiaJogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-17) in the state of Assam under Bharatmala Pariyojana on EPC mode. (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati road (NH 17) in the state of Assam on EPC mode. Click Here

  • NIT
  • Corrigendum-I
  • Technical Evaluation Result
Assam17-06-2021
1828

    RFP for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka - Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 113+830) in the state of Assam on EPC mode. Click Here

  • NIT
  • Corrigendum-I
  • Corrigendum-II
  • Technical Evaluation Result
Assam17-06-2021
1829Arunachal Pradesh18-06-2021
1830Sikkim18-06-2021