Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
1721 |
RFP for Maintenance and Repair of NH-127B from Nengkra (Km 0.000 to Km 21.200) to Williamnagar-Williamnagar Junction [Total Length 21.20 km] in the State of Meghalaya in FY 2021-22 (Item Rate & Work Order Basis). Click Here | Meghalaya | 17-04-2021 |
1722 |
RFP for Maintenance and Repair of NH from Paikan (Km 25.000 to Km 35.000) to Tura [Total Length 10.00 km] in the State of Meghalaya in FY 2021-22 (Item Rate & Work Order Basis). Click Here | Meghalaya | 17-04-2021 |
1723 |
RFP for Notice Inviting Bid for Lease of Staff Accommodation, for NHIDCL, PMU-Churachandpur, Manipur. Click Here | Manipur | 17-04-2021 |
1724 | RFP for Hiring of 01 no. of Vehicle (Top Model 4x4 drive or equivalent, i.e. Scorpio, Duster, Thar or equivalent) on Monthly Basis for PMU- Pfutsero, NHIDCL, in the state of Nagaland. (2nd Call) Click Here | Nagaland | 17-04-2021 |
1725 |
RFP for Maintenance and Repair of NH-62 from Damra (Km 34.000 to Km 43.000) & (Km 63.000 to Km 72.000) to Nengkra [Total Length 18.00 km] in the State of Meghalaya in FY 2021-22 (Item Rate & Work Order Basis). Click Here | Meghalaya | 18-04-2021 |
1726 |
RFP for Ordinary Repair of NH-08 from S.K.Para to Ambassa (between Km 375.00 to Km 395.00 in various stretches (Total Length=10.5 Km) & construction of 600m RCC pucca drain in the state of Tripura on percentage basis & work order basis. Click Here | Tripura | 19-04-2021 |
1727 |
RFP for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. (ii) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 10.000 at Dialong to km 20.500 near Old Tamenglong (Length10.5km) (PKG-2) on EPC mode. (iii) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. (iv) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Click Here | Manipur | 19-04-2021 |
1728 |
RFP for Consultancy services for Authority’s Engineer for Supervision of “(i) Construction of 2-lane Chisopani Traffic Tunnel of length 250 m including approaches from Km 67+080 to Km 67+500 on NH-10 in East District of Sikkim on EPC basis. & (ii) Special protection work on rehabilitation and restoration of sliding/sinking zone from Km 70+900 to Km 71+100 and Km 71+550 to Km 71+850 with JICA Technical Assistance including widening of narrow zone from Km 53+775 to Km 54+100 and fom Km 63+045 to Km 63+470 on NH-10 (Rangpo to Ranipool section).†Click Here | Sikkim | 19-04-2021 |
1729 |
RFP for Hiring of Vehicles on Monthly Basis- 2nd Call For Site offices under PMU BASAR, Arunachal Pradesh. Click Here | Arunachal Pradesh | 20-04-2021 |
1730 |
RFP for Hiring of Vehicles on Monthly Basis- 2nd Call For PMU BASAR, Arunachal Pradesh. Click Here | Arunachal Pradesh | 20-04-2021 |