Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
1401 |
RFP for Providing & supplying of commercial vehicle 4 Nos. (01 Scorpio S-11 top model, 02 Mahindra Bolero/TUV 300 & 1 Gypsy) on monthly basis for NHIDCL PMU- Senapati in the State of Manipur. Click Here | Manipur | 07-12-2020 |
1402 |
RFP for Restoration/Rehabilitation of Imphal to Jiribam road of NH-37 (old NH-53) from Km 145.350 to Km 158.618 in the State of Manipur. Click Here | Manipur | 07-12-2020 |
1403 |
RFP for Consultancy Services for Authority’s Engineer for Supervision of (i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP) (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.450 (Length – 19.675 Km) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) - TSP†. Click Here | Nagaland | 08-12-2020 |
1404 |
RFP for Construction of High Altitude Hill road from Taksing to Ghora from KM 0.000 to KM 7.090 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode. Click Here | Arunachal Pradesh | 08-12-2020 |
1405 |
RFP for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim & Uttarakhand in high altitude remote areas. Click Here | Delhi | 09-12-2020 |
1406 |
RFP for Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas. Click Here | Delhi | 09-12-2020 |
1407 |
RFP for Repair & Maintenance work of Indira Byepass from Km 0.000 to 10.117 including rehabilitation of Sinking zone & Safety work in State of Sikkim on item rate contract basis. Click Here | Sikkim | 09-12-2020 |
1408 |
RFP for Snow Clearance from km 160.00 (Army Post Chingam) to km 215.00 (Daksum) on Batote-Kishtwar-Sinthanpass-Khanabal road of NH-244, to make road stretch traffic worthy during winter season, in the UT of Jammu & Kashmir. Click Here | Union Territory of Jammu and Kashmir | 10-12-2020 |
1409 |
RFP for Construction of 2 laning with paved shoulder of new greenfield alignment from Helipad at Menla at km 82.000 to Menla at Km 94.030 of Rhenok – Menla spur (NH-717B) Package-IIIB on EPC Basis under SARDP-NE Phase ‘A’ in the State of Sikkim. Click Here | Sikkim | 10-12-2020 |
1410 |
RFP for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH-113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. (ii) Construction of two lane with hard shoulders of Demwe-Brahmkund section of NH- 13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Click Here | Arunachal Pradesh | 10-12-2020 |