Sorry, you need to enable JavaScript to visit this website.

Tender Archive

Bid Due Date
Sr. No.DescriptionSTATE / TERRITORYBID DUE DATESort ascending
1331Nagaland02-11-2020
1332

    RFP for Hiring of Commercial Vehicle 1 No. on monthly basis for one year contract for NHIDCL, GM/DGM (P), PMU-Lawngtlai, Mizoram.   Click Here

Mizoram02-11-2020
1333

    RFP for Consultancy services for Authority’s Engineer for Supervision of“Construction and Upgradation of existing road on NH-510 between Rabangla to Gyalshing to 2-lane with paved shoulder configuration in the State of Sikkim under SARDP-NE Phase ‘A’ on EPC mode for (i) Km 32+500 to Km 33+600 (Package-III), (ii) Km 33+600 to Km 58+840 (Package IV), (iii) Km 58+840 to Km 75+000 (Package V) &  (iv) Km 75+000 to Km 90+210(Package VI)” Click Here

  • NIT
  • Corrigendum-I
  • Corrigendum-II
  • Addendum-I
  • Pre-Bid Query
  • Corrigendum-III
  • Annulment Notice
Sikkim03-11-2020
1334

    RFP for Hiring of 01 no. of Vehicle on Monthly Basis for NHIDCL, Site Office-Peren in the state of Nagaland. Click Here

Nagaland03-11-2020
1335

    RFP for  Hiring of Commercial Vehicle 1 No. on monthly basis for one year contract for  NHIDCL, GM/DGM (P), PMU-Lawngtlai, Mizoram. Click Here

Mizoram03-11-2020
1336

    RFP for Consultancy services for Authority’s Engineer for Supervision of  (i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I)  (ii) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II)  (iii) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 21.00 to design Km 32.00 [Design Length – 11.00 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package III) Click Here

  • NIT
  • Corrigendum-I
  • Corrigendum-II
  • Austha Summary
  • Cemosa Summary
  • Geo Design Summary
  • Global Infra Summary
  • L N Malviya Summary
  • Marc Summary
  • Technical Evaluation Result
Nagaland05-11-2020
1337

    RFP for Consultancy services for Authority’s Engineer for Supervision of  i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.00 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package IV) (ii) Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under NH(O) – TSP in the state of Nagaland in EPC mode.  Click Here

  • NIT
  • Corrigendum-I
  • Corrigendum-II
  • Austha Summary
  • Cemosa summary
  • Geo Summary
  • Global Summary
  • LN Malviya Summary
  • Marc Summary
  • Technical Evaluation Result
Nagaland05-11-2020
1338Sikkim06-11-2020
1339

    RFP for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Ranipool. Click Here

Sikkim09-11-2020
1340

    RFP for Providing the Services of Vehicles on Monthly Basis to NHIDCL, PMU-Ranipool in the State of Sikkim. Click Here

Sikkim09-11-2020