RFP for Balance Work for Construction of Two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing Km 30.474(Near Kidwema road Chakahabama) to existing Km 53.220 (Near Kikruma village) [Design km 29.6 to Design Km 51.5] [Design length- 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Pkg-II). Click Here
RFP for One Time Improvement of Kumarghat to Kailashahar section of NH-208 from existing Km 0+000 to Km 1+500, Km 2+300 to Km 3+300, Km 4+500 to Km 5+700, Km 6+000 to Km 6+400 & Km 18+500 to Km 19+500; Total Length: 5.100 Km in the state of Tripura in the FY 2023-24 on percentage basis. Click Here
RFP for M&R work for making the road trafficable from km 25.600 to km 26.100 of NH-717A in the State of West Bengal on Item Rate Contract Basis (2nd Call) Click Here
RFP for Consultancy Services as Authority’s Engineer for Supervision of Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam. Click Here
RFP for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of Bilasipura- Guwahati road(NH 17) [Section: Dhupdhara Sahar to Milmila R.F (before Chayagaon Market)] in the state of Assam on EPC mode. Length- 33.684 Km. ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 177+372km to Ch.203+783km (Design Ch.173+434km to Ch.200+750km) for Package-10 of Bilasipura- Guwahati road(NH 17) (Section: Milmila R.F(before Chayagaon Market) to Approach of Airport Junction(VIP Chowk) in the state of Assam on EPC mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 27.316km). Click Here
RFP for Consultancy Services as Authority’s Engineer for Supervision of: (i) Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the State of Assam on EPC Mode under BharatmalaPariyojana in Economic Corridors (Project Length – 11.8 km) (ii) Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at KandigramChaita Village in the State of Assam on EPC Mode under BharatmalaPariyojana in Economic Corridors (Project Length – 11.3 km). Click Here
RFP for Consultancy Services as Authority’s Engineer for Supervision of: i) Four laning of Silchar - Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 20+000) on Silchar - Vairengte - Sairang road in the State of Assam under BharatmalaPariyojna on EPC mode. (Project Length – 20.00 km). ii) Four laning of Dhanehari – Lailapur / Vairengte section (Package-2) from Existing Chainage km 12+920 to km 43+000 of NH 306 (Design Chainage km 20+000 to km 49+360) on Silchar - Vairengte - Sairang road in the State of Assam under BharatmalaPariyojna on EPC mode. (Project Length – 29.360 km). Click Here
RFP for Repair and Restoration of Vairengte-Sairang Road from Chainage Km. 42.000 to Km. 56.000 (Package-1) on NH-306 & 6 in the state of Mizoram under percentage rate & Work order basis in FY 2022-23.(2nd Call). Click Here
RFP for Repair and Restoration of Vairengte-Sairang Road from Chainage Km. 56.000 to Km 70.000 (Package -02) on NH-306 & 6 in the state of Mizoram under percentage rate & Work order basis in FY 2022-23.(2nd Call). Click Here
RFP for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh & UT of Ladakh in high altitude remote areas on lumpsum mode. Click Here