RFP for Providing & supplying of 04 Nos. vehicles (01 Innova Crysta (top model) & 03 Bolero or equivalent) on monthly basis for NHIDCL PMU-Akhnoor in the UT of Jammu & Kashmir. Click Here
RFP for the work of Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II). Click Here
RFP for Special Repair of NH-702A from Chozuba to Phek (Km 0.000 to Km 44.600) [Total Length = 44.6 Km] in the state of Nagaland in the year 2020-21. Click Here
RFP for Earthwork in Formation, Road Work, Construction of Bridges, Blanketing, P. Way Linking works including Supply of P. Way Fittings and Track Ballast in connection with Construction of Railway Siding from Jogighopa Railway Station to MMLP at Jogighopa, Distt - Bongaigaon, Assam from Ch. 00 to 3760 - Package III of MMLP - Third Call. Click Here
RFP for Development of Multilevel Car Parking System and Commercial Complex on PPP Model at South Block, Bahu Plaza, Jammu. Click Here
RFP for Development of Multi Level Car Parking System and Commercial Complex on PPP Model at Panchvakhtar Temple, Jammu in the UT of Jammu & Kashmir. Click Here
RFP for the work of Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under Bharatmala NH(O) – TSP in the state of Nagaland in EPC mode. Click Here
RFP for Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Click Here
RFP for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 and (Design km 0.000 to km 14.660), (Design length – 14.660 km) on EPC basis in the state of Assam. (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800 to Ch.84.100) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of Bilasipura- Guwahati road (NH-17) in the state of Assam on EPC mode. Click Here
RFP for Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Click Here