Independent Engineer Services for Four Laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) Read more about Independent Engineer Services for Four Laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV)
Independent Engineer services for supervision of Construction of 4 (Four) Lane with Paved Shoulder for existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500 Km) of Chandkhira Village – Churaibari Section of NH-8 in the state Read more about Independent Engineer services for supervision of Construction of 4 (Four) Lane with Paved Shoulder for existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500 Km) of Chandkhira Village – Churaibari Section of NH-8 in the state
Short Term Maintenance Contract of NH-39 (New NH-02) from Kohima to Mao Stretch (from Km 185.540 to Km 194.000) [Length=8.46 Km] in the State of Nagaland in the FY 2024-25” – Percentage Rate and Work Order Basis, at “Risk and Cost” of EPC Contractor Read more about Short Term Maintenance Contract of NH-39 (New NH-02) from Kohima to Mao Stretch (from Km 185.540 to Km 194.000) [Length=8.46 Km] in the State of Nagaland in the FY 2024-25” – Percentage Rate and Work Order Basis, at “Risk and Cost” of EPC Contractor
Short Term Maintenance Contract of NH39 New NH02 from Kohima to Mao Stretch from Km 194.000 to Km 212.334 Length 18.334 Km in the State of Nagaland in the FY 2024-25 Percentage Rate and Work Order Basis, at Risk and Cost of EPC Contract Read more about Short Term Maintenance Contract of NH39 New NH02 from Kohima to Mao Stretch from Km 194.000 to Km 212.334 Length 18.334 Km in the State of Nagaland in the FY 2024-25 Percentage Rate and Work Order Basis, at Risk and Cost of EPC Contract
Rectification of Black Spots /Accident Prone locations on Batote-Khellani Road stretch by Installation of Metallic Crash Barrier, Road Signages, raising of outer earthen shoulders etc., along with Clearance of landslide & Snow on NH-244 in the UT of Jammu Read more about Rectification of Black Spots /Accident Prone locations on Batote-Khellani Road stretch by Installation of Metallic Crash Barrier, Road Signages, raising of outer earthen shoulders etc., along with Clearance of landslide & Snow on NH-244 in the UT of Jammu
Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km Read more about Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km
Consultancy Services as Authority’s Engineer for Supervision of Improvement & Widening of existing NH-08 from Champaknagar to Khayerpur to Four lane with paved shoulder (design Km 242+500 to Km 261+610) in the state of Tripura on EPC basis Read more about Consultancy Services as Authority’s Engineer for Supervision of Improvement & Widening of existing NH-08 from Champaknagar to Khayerpur to Four lane with paved shoulder (design Km 242+500 to Km 261+610) in the state of Tripura on EPC basis
Independent Engineer services for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Nea Read more about Independent Engineer services for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Nea
Consultancy Services as Authority’s Engineer for Supervision of: i) Ukhrul bypass on NH-102A (Package-1, Length-6.571 km) ii) Finch Corner to Ukhrul section of NH-202 (Package-3, Length-14.63 km) & iii) Ukhrul to Choithar section of NH-202 (Package-4, Len Read more about Consultancy Services as Authority’s Engineer for Supervision of: i) Ukhrul bypass on NH-102A (Package-1, Length-6.571 km) ii) Finch Corner to Ukhrul section of NH-202 (Package-3, Length-14.63 km) & iii) Ukhrul to Choithar section of NH-202 (Package-4, Len