Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o Read more about Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o
Technical Evaluation Result Tender for disposal of old/obsolete computer hardware and peripherals of National Highways and Infrastructure Development Corporation Ltd (NHIDCL) Corporate Office, 3rd Floor of PTI Building Read more about Technical Evaluation Result Tender for disposal of old/obsolete computer hardware and peripherals of National Highways and Infrastructure Development Corporation Ltd (NHIDCL) Corporate Office, 3rd Floor of PTI Building
Technical evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of Twin Tube Uni-directional Tunnel (10.8 km) under Ganesh top hill including appr Read more about Technical evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of Twin Tube Uni-directional Tunnel (10.8 km) under Ganesh top hill including appr
Technical Evaluation of Consultancy Services for Authority’s Engineer For Supervision of the following projects: i. Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal- Ukhrul-Jessami Econom Read more about Technical Evaluation of Consultancy Services for Authority’s Engineer For Supervision of the following projects: i. Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal- Ukhrul-Jessami Econom
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: i) Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 2 Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: i) Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 2
Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i. Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) on NH-515 in the State o Read more about Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i. Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) on NH-515 in the State o
Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i. Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukia-Makum Bypa Read more about Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i. Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukia-Makum Bypa
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of B Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of B
Technical Evaluation Result for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-I: Road Works from Km 453+000 to Km 463+000 (10.000 Km), under SARDP-NE, under EPC Mode Read more about Technical Evaluation Result for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-I: Road Works from Km 453+000 to Km 463+000 (10.000 Km), under SARDP-NE, under EPC Mode
Technical Evaluation Result for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-III: Road Works from Km 477.000 to Km 490+800 (13.800 Km), under SARDP-NE, under EPC Mode Read more about Technical Evaluation Result for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-III: Road Works from Km 477.000 to Km 490+800 (13.800 Km), under SARDP-NE, under EPC Mode