Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Vacancies
    • Archive
  • Contact
Recruitment Portal

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation result for the project of CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) Rehabilitation and Up-gradation of Beodnabad – Ferrargunj Section of NH-223 (New NH-4) from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2-Lane w

  • Read more about Technical Evaluation result for the project of CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) Rehabilitation and Up-gradation of Beodnabad – Ferrargunj Section of NH-223 (New NH-4) from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2-Lane w

Technical Evaluation result for the project of Selection of NGO to assist in resettlement plan implementation for IMPHAL – MOREH road in the state of Manipur. Dated: 18-08-2017

  • Read more about Technical Evaluation result for the project of Selection of NGO to assist in resettlement plan implementation for IMPHAL – MOREH road in the state of Manipur. Dated: 18-08-2017

Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from (i) design Km. 20+000 to Km. 32+050 [Existing Km 20.000 to Km 3

  • Read more about Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from (i) design Km. 20+000 to Km. 32+050 [Existing Km 20.000 to Km 3

Revised Technical Evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “(i) Construction of Extra-dosed RCC Bridge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH

  • Read more about Revised Technical Evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “(i) Construction of Extra-dosed RCC Bridge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH

Technical Evaluation result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of 2 laning of (i) Maram-Peren-Dimapur section on NH 129A (Ma

  • Read more about Technical Evaluation result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of 2 laning of (i) Maram-Peren-Dimapur section on NH 129A (Ma

Technical Evaluation result for the project of Consultancy Services for Authority’s Engineer for: i) Rehabilitation and up-gradation of Beodnabad-Ferrargunj Section of NH-223 (New NH-4) from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2-Lane wit

  • Read more about Technical Evaluation result for the project of Consultancy Services for Authority’s Engineer for: i) Rehabilitation and up-gradation of Beodnabad-Ferrargunj Section of NH-223 (New NH-4) from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2-Lane wit

Technical Score for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of

  • Read more about Technical Score for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of

Tender Evaluation result of project Construction, Operation and Maintenance of 2-lane bi-directional zojila tunnel with parallel escape (egress) tunnel including approaches on srinagar-leh section connecting nh-1 at km 95.00 and at km 118.00 in the state

  • Read more about Tender Evaluation result of project Construction, Operation and Maintenance of 2-lane bi-directional zojila tunnel with parallel escape (egress) tunnel including approaches on srinagar-leh section connecting nh-1 at km 95.00 and at km 118.00 in the state

Technical Score for the Project of Two/ Four laning of Imphal-Moreh Section of NH-39 from Km 330.00 to Km 395.680 in the State of Manipur” – Hiring of NGO. Dated : 19-07-2017

  • Read more about Technical Score for the Project of Two/ Four laning of Imphal-Moreh Section of NH-39 from Km 330.00 to Km 395.680 in the State of Manipur” – Hiring of NGO. Dated : 19-07-2017

Technical Evaluation Result for the Project of Routine Maintenance of Chidiya Tapu to Middle Strait from Km 0.00 to Km 107.00 (Km 0-12, 21-28 & 45-107) of NH-4 (old NH- 223) (Maintenance Package-I) in the Union Territory of Andaman and Nicobar Island. Dat

  • Read more about Technical Evaluation Result for the Project of Routine Maintenance of Chidiya Tapu to Middle Strait from Km 0.00 to Km 107.00 (Km 0-12, 21-28 & 45-107) of NH-4 (old NH- 223) (Maintenance Package-I) in the Union Territory of Andaman and Nicobar Island. Dat

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 102
  • Page 103
  • Page 104
  • Page 105
  • Current page 106
  • Page 107
  • Page 108
  • Page 109
  • Page 110
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 30/11/2025

  • Total Visitors: 420499