Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening & Read more about Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening &
Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP Read more about Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call) Read more about Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call)
Consultancy Services as Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on E Read more about Consultancy Services as Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on E
Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode Read more about Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode
Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57+500 of NH-127B (Design chainage Km 0+000) and ending at existing Km 108+750 of NH217 (Design chainage Km 29+030) (Length-29.030 Km) on Hybrid Annuity Mode in the state Read more about Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57+500 of NH-127B (Design chainage Km 0+000) and ending at existing Km 108+750 of NH217 (Design chainage Km 29+030) (Length-29.030 Km) on Hybrid Annuity Mode in the state
Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting -Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. Read more about Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting -Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode.
Short Term Maintenance Contract for Hill cutting across the Chathe river at Ch 126.700 to 126.800, Tseidukhru area in Dimapur Kohima road section on NH-29 in the state of Nagaland in FY: 2025-26 (Percentage Rate and work Order Basis)-2nd Call Read more about Short Term Maintenance Contract for Hill cutting across the Chathe river at Ch 126.700 to 126.800, Tseidukhru area in Dimapur Kohima road section on NH-29 in the state of Nagaland in FY: 2025-26 (Percentage Rate and work Order Basis)-2nd Call
Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT o Read more about Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT o