Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening & Read more about Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening &
Upgradation from 2 Lane with PS to 4 Lane configuration of NH-15 from Ch 381+000 at Gogamukh to Ch 438+000 at Kulajan Tiniali in the State of Assam Read more about Upgradation from 2 Lane with PS to 4 Lane configuration of NH-15 from Ch 381+000 at Gogamukh to Ch 438+000 at Kulajan Tiniali in the State of Assam
(i) Strengthening of Udaipur–Sabroom section from km 55.000 to km 127.372 of NH-08 and (ii) Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode. Read more about (i) Strengthening of Udaipur–Sabroom section from km 55.000 to km 127.372 of NH-08 and (ii) Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode.
Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: Read more about Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length:
Short Term Maintenance work (Miscellaneous Structure works) from Km. 368.000 to Km. 468.000 of Rudraprayag to Helang on NH-7 (old NH-58) under M&R Head and at Risk & Cost of the EPC Contractor in the state of Uttarakhand Read more about Short Term Maintenance work (Miscellaneous Structure works) from Km. 368.000 to Km. 468.000 of Rudraprayag to Helang on NH-7 (old NH-58) under M&R Head and at Risk & Cost of the EPC Contractor in the state of Uttarakhand
Periodical repair by way of Scarifying, Laying of WMM, Bituminous Macadam & Bituminous Concrete & Installation of Traffic Signs, Markings & Other Road Appurtenances including fixing of Pipe Culverts, Construction of abutments for Bailey Bridge, Launching/ Read more about Periodical repair by way of Scarifying, Laying of WMM, Bituminous Macadam & Bituminous Concrete & Installation of Traffic Signs, Markings & Other Road Appurtenances including fixing of Pipe Culverts, Construction of abutments for Bailey Bridge, Launching/
Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening & Read more about Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening &
Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP Read more about Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call) Read more about Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call)
Consultancy Services as Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on E Read more about Consultancy Services as Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on E