Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
3001 |
RFP for Restoration and Repair of existing NH-208A from Dharmanagar to Kadamtala Tri-junction (Ch. 27.500 to Ch. 39.000) (Total length 11.500 Km) in the State of Tripura in the FY 2023-24 on percentage basis & work order basis Click Here | Tripura | 26-09-2023 |
3002 | RFP for Hiring of 1 no. SUV or Equivalent vehicle on monthly basis for ED (P), NHIDCL Regional Office- Kohima, Nagaland Click Here | Nagaland | 26-09-2023 |
3003 |
RFP for Restoration and Repair of NH-08 between Ch 375+000 to Ch. 377+974, Ch. 380+000 to Ch. 381+100, Ch 382+500 to Ch 388+100, Ch 388+700 to Ch 390+900, Ch 392+100 to Ch 393+400 & Ch 394+667 to Ch 395+000 (Total length-13.50 Kms) in the state of Tripura in the FY 2023-24 on percentage basis & work order basis Click Here | Tripura | 29-09-2023 |
3004 |
RFP for M&R work for making the road trafficable from km 25.600 to km 26.100 of NH-717A in the State of West Bengal on Item Rate Contract Basis (5th Call) Click Here | West Bengal | 29-09-2023 |
3005 |
RFP for Hiring of 02 nos. Inspection Vehicle SUV on monthly basis for NHIDCL PMU Pfutsero in the state of Nagaland Click Here | Nagaland | 29-09-2023 |
3006 |
RFP for Repair and Maintenance of National Highway NH-40 Shillong-Dawki Road between km 158.500 to km 163.400 along the existing road Pkg-V along the existing road of NH-40 in the State of Meghalaya for the FY 2023-24 Item Rate Basis Total length = 4.9 km Click Here | Nagaland | 30-09-2023 |
3007 |
RFP for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-I: Road Works from Km 453+000 to Km 463+000 (10.000 Km), under SARDP-NE, under EPC Mode Click Here | Assam | 03-10-2023 |
3008 |
RFP for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-IV: Structures & Toll Plaza, under SARDP-NE, under EPC Mode Click Here | Assam | 03-10-2023 |
3009 |
RFP for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-III: Road Works from Km 477.000 to Km 490+800 (13.800 Km), under SARDP-NE, under EPC Mode Click Here | Assam | 03-10-2023 |
3010 |
RFP for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-II: Road Works from Km 463 to Km 477 (14.000 Km), under SARDP-NE, under EPC Mode Click Here | Assam | 03-10-2023 |