Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
2901 |
RFP for Restoration & Repair of Potholes developed in selected stretch of NH-208 from Ch. 150.000 (7th Mile) km to Ch. 229.530 km (Ailmara Tri-Junction) in the state of Tripura in the year of 2023-24 (2nd Call). Click Here | Tripura | 16-06-2023 |
2902 |
RFP for Consultancy Service for Preparation of Feasibility Study and Detailed Project Report for development of existing road to 4- Lane with paved shoulder of Barapani - Shillong Road (NH-06) from Km 61+800 to Km 78+000 alongwith bridge at Umiam Dam in Meghalaya for execution on EPC Mode. Click Here | Meghalaya | 16-06-2023 |
2903 |
RFP for Maintenance & Repair work of existing steel bridge painting on UdaipurSabroom section from Ch.55.000 to Ch.128.712 of NH-08 and Protection of slope & Toe of existing diversion road at collapsed Bailey bridge of 140 feet at Ch 180.000 km over Sonaichhara River of 7th mile to Amarpur tri junction section of NH-208 in the state of Tripura in FY 2023-24 (2nd Call). Click Here | Tripura | 17-06-2023 |
2904 |
RFP for Restoration and repair of Silchar-Vairengte section from Km 40.3000 to Km 42.000 of NH306 in FY: 2023-2024. Click Here | Assam | 17-06-2023 |
2905 |
RFP for Restoration and Repair Work of Mungiakami – Chandrapur (ISBT) road in various stretch (Km 422.000 to Km 423.000, Km 436.700 to Km 437.500, Km 437.750 to Km 438.000, Km 438.340 to Km 443.000, Km 444.000 to Km 445.000, Km 453.000 to Km 455.000, Km 456.540 to Km 458.040 and Km 465.000 to Km 479.440) (Total Length = 25.650 Km) of NH-08 in the State of Tripura in the FY 2023-24 (2nd call). Click Here | Tripura | 22-06-2023 |
2906 |
RFP for “Restoration & Repairs of NH-129A from Peren to Dimapur Section from Km. 126+775 to Km. 146+208 (Package-II) (Length 19.433 Km.) in the State of Nagaland in the FY 2023-24†- (Percentage Rate and Work Order Basis). Click Here | Nagaland | 23-06-2023 |
2907 |
RFP for M&R work for making the road trafficable from km 25.600 to km 26.100 of NH-717A in the State of West Bengal on Item Rate Contract Basis. Click Here | West Bengal | 23-06-2023 |
2908 |
RFP for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukia -Makum Bypass of NH-15 (Old NH 37) and Improvement of existing NH-315 (Old NH-38) from Km 0+000 (Chotahapjan) to Km 16+900 (Bogapani section) (2-Lane +PS) in the State of Assam on EPC mode. (Package-3) ii) Strengthening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield)(2-Lane+PS) of NH-315 (Old NH-38)in Tinsukia District in the State of Assam on EPC mode(Package-4) iii) Strengthening/Improvement to 2-Lane with Paved Shoulder from km 27+150 (Golai Gaon) to km 47+682 (Ledo) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield) (2-Lane+PS) of NH-315 (Old NH-38) in Tinsukia District in the State of Assam on EPC mode. (Package-5) 2nd Call. Click Here | Assam | 26-06-2023 |
2909 |
RFP for Balance Work of Construction of Two-lane with hard shoulders of ChangtongyaLongleng Road on EPC basis from existing Km 16+530 to Km 29+530 [Design Km.18+779 to Km. 31+779] (Design Length – 13+000 Km) in the state of Nagaland (Pkg-2) under NH (O) Plan. Click Here | Nagaland | 28-06-2023 |
2910 |
RFP for Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram. Click Here | Mizoram | 28-06-2023 |