Sorry, you need to enable JavaScript to visit this website.

Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing K

Sub Title
Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of (Khupa – Hayuliang Road) to Km 8.970 (Hayuliang – Hawai Road)] (ii) design Km. 17.000 (Khupa) to Km. 34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] (iii) design Km. 34.000 to Km. 51.825 [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] (iv) Two-Laning of Hayuliang– Hawai bypass Road on EPC basis from des
Year