Sorry, you need to enable JavaScript to visit this website.

Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 K

Sub Title
Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 KM] IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE (PACKAGE I). Dated : 16-01-2023.
Year
Tender Date