Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF 2 LANING OF AKAJAN-LIKABALI-BAME ROAD ON EPC BASIS FROM DESIGN KM 33.00 TO KM 65.810 (EXISTING KM 36.00 TO KM 71.00) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE). Dated: 29-01-2021.